Pipelines | Tenderlake

Pipelines

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
01 August 2023
Closing Date:
07 September 2023
Location(s):
DE118 Heilbronn, Landkreis (DE Germany/DEUTSCHLAND)
Description:
Zero Emission: Lot 390 + 392 - H2CT Cryo-Infrastructure and gaseous supply systems

The existing H2 Container Test Center has four test positions where at moment only tests with gaseous hydrogen can be performed. One of the test positions shall now be extend to liquid hydrogen and later liquid nitrogen (in the same system) infrastructure.

Therefore, the following systems are needed:

• Extension of the gaseous supply system and a new gaseous Helium supply system with a new panel in the test center

• Build up a cryogenic supply system for liquid hydrogen (also suitable for liquid nitrogen) with a new panel in the test center

• A new panel at the test position to connect the new infrastructures

• Build up a cryogenic exhaust system for liquid hydrogen and process gases (gaseous hydrogen, nitrogen and helium)

As interfaces DLR provides:

• Gaseous Helium storage (gas bundles)

• Cryogenic tank for liquid hydrogen and nitrogen

• Vent stack including catch tank for the exhaust system


Zero Emission H2CT Cryogenic Extension – Gaseous System

The existing H2 Container Test Center has four test positions where at moment only tests with gaseous hydrogen can be performed. One of the test positions shall now be extend to liquid hydrogen and later liquid nitrogen (in the same system) infrastructure.

Therefore, the following systems are needed:

• Extension of the gaseous supply system and a new gaseous Helium supply system with a new panel in the test center

• Build up a cryogenic supply system for liquid hydrogen (also suitable for liquid nitrogen) with a new panel in the test center

• A new panel at the test position to connect the new infrastructures

• Build up a cryogenic exhaust system for liquid hydrogen and process gases (gaseous hydrogen, nitrogen and helium)

As interfaces DLR provides:

• Gaseous Helium storage (gas bundles)

• Cryogenic tank for liquid hydrogen and nitrogen

• Vent stack including catch tank for the exhaust system

This lot includes the extension of the gaseous supply system including the gaseous panel and the field piping.


Zero Emission H2CT Cryogenic Extension – Cryogenic System

The existing H2 Container Test Center has four test positions where at moment only tests with gaseous hydrogen can be performed. One of the test positions shall now be extend to liquid hydrogen and later liquid nitrogen (in the same system) infrastructure.

Therefore, the following systems are needed:

• Extension of the gaseous supply system and a new gaseous Helium supply system with a new panel in the test center

• Build up a cryogenic supply system for liquid hydrogen (also suitable for liquid nitrogen) with a new panel in the test center

• A new panel at the test position to connect the new infrastructures

• Build up a cryogenic exhaust system for liquid hydrogen and process gases (gaseous hydrogen, nitrogen and helium)

As interfaces DLR provides:

• Gaseous Helium storage (gas bundles)

• Cryogenic tank for liquid hydrogen and nitrogen

• Vent stack including catch tank for the exhaust system

This lot includes the cryogenic supply system including the croygenic panels, the field piping and the exhaust field piping.

Download full details as .pdf
The Buyer:
Deutsches Zentrum für Luft- und Raumfahrt e.V. (DLR) - Lampoldshausen
CPV Code(s):
44161000 - Pipelines