Electrical work (high and low current)
The municipal council of the city of Offenbach am Main intends to build a three-course primary school in addition to a single-field gym on the site intended for common use in the new Bieber Nord development area. A daycare centre with 6 groups is also to be located on this property.
N2XCH ca. 740 m
NYCWY ca. 400 m
NHXMH-J ca. 19000 m
How. 7 Netzwerkleitung Simplex ca. 60.000 m
Feldverteiler UP 9 Stk.
Feldverteiler AP 3 Pcs.
Single stand distributor 6 pcs.
Kabeltrasse ca. 1725 m
Schuko sockets UP approx. 1100 pcs
Button UP approx. 210 pcs.
Blind control panels 2 pcs.
Weather station with mast 2 pcs.
AC motor controller for blinds 26 pcs.
DALI-2 presence detector 92 pcs.
Motion detector ceiling mounting 138 pcs.
Recessed downlights 236 pcs.
Recessed luminaire for classrooms 487 pcs.
Surface-mounted luminaire as panel lighting 42 pcs.
LED-FR-Wannenleuchte 61 Stk.
Pole luminaires incl. 4m light pole 8 pcs.
Safety luminaires Ceiling installation 255 pcs.
Escape sign luminaires 125 pcs.
Electroacoustic system 1 pcs.
Recessed ceiling speaker 155 pcs.
Central house alarm system 2 pcs.
Fire Brigade Information Centre FIZ 2 pcs.
Fire brigade display table FAT 2 pcs.
Multi-sensor detector 117 pcs.
Multi-sensor detector with sound output 124 pcs.
Acoustic signal generators 87 pcs.
Handheld fire detector 28 pcs.
Burglar alarm panel 1 pcs.
Switching devices 4 pcs.
Dual motion detector 40 pcs.
Server cabinet 1200x800x2000 3 pcs.
Network cabinet 800x800x2000 3 pcs.
2-fold Cat. 6a network sockets 276 pcs.