The Bad Kreuznach wastewater disposal facility (client AG or ABW for short) intends to convert the Ebernburg sewage treatment plant (with approx. 9500 EW) into a wastewater pumping station with a new construction of a pressure pipe (approx. 1380m) for connection to the ABW sewer network.
The needs assessment is complete. For details of the action, refer to the SOW, which is available for download.
The planning services required for the measure are to be awarded in 3 lots: lot 1 object planning services for the engineering structures and the planning services of mechanical equipment, lot 2 planning services for technical equipment electrical and electronic MSR technology and lot 3 services of structural engineering.
The subject of this announcement is Lot 3 - Services of Structural Engineering.
The subject of this announcement is Lot 3 - Services of Structural Engineering. The scope of processing includes services of structural engineering LP 1-6 HOAI in terms of HOAI: § 51.
The anticipated eligible costs are
pumping station 300,000 EUR.
In addition, the necessary structural engineering services that are required for the installation of the pressure pipeline in the course of the near-crossing must be provided.
The approval planning is to be created by the end of May 2022. A structural realization of the measure is planned in 2023.