Sewage work | Tenderlake

Sewage work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
10 March 2023
Closing Date:
19 April 2023
Location(s):
NL NEDERLAND (NL Netherlands/NEDERLAND)
Description:
Construction team "Renovation and expansion SVI Mierlo"

This is a European tender for participation in the construction team for P084701 Renovation and expansion SVI Mierlo.

The contracting authority shall conclude a written construction team agreement with one tenderer per lot and shall be concluded for the duration of the construction team phase. After the construction team phase, it is the intention to conclude a realization agreement (and if applicable a coordination agreement) with the Contractor.

The contracting authority has divided the contract into several lots:

Lot 1: Integral consultancy and engineering services

Lot 2: Civil engineering work

Lot 3: mechanical engineering work

Lot 4: Electrical engineering work

Lot 5: Review, supervision and management.

Consulting and engineering services during engineering and realization.

Lot 1 Integral consultancy/engineering services

(The list below is not exhaustive).

Among others, the following disciplines process technology / wastewater technology, civil engineering, engineering, mechanical engineering, electrical engineering + instrumentation, industrial automation, building-related installations (and sustainability), environment (smell, noise, nitrogen deposition, air quality, soil quality, etc.), permits.

Drawing up WBS (work breakdown structure);Drawing up a programme of requirements in collaboration with the other Contractors;Design (VO, DO, UO) in collaboration with the other Contractors;Giving substance to structural safety through the role of chief constructor (designing constructor and coordinating constructor) Recording the choices made / responsible partner Carrying out investigations and drawing up advice in collaboration with the other Contractors; Elaboration in 3-D/BIM in collaboration with the other Contractors; Conducting Integral technical management construction team phase; Cost estimates in the design phases VO / DO with input from other plots; Drawing up documents for application for (environmental) permits (environment / construction / demolition, exemptions, nitrogen deposition, decisions and permissions); Project management Construction team phase: Planning management, Quality management, Safety management, Risk management, Document management, Environmental management and permit management;Drafting documents "V&G", such as V&G files and V&G-plan design phase Drawing up a phasing plan / conversion plan in collaboration with other partners;

Engineering and realization of civil engineering and construction work.

Lot 2 Engineering and realization of civil engineering and construction work

(The list below is not exhaustive). Drawing up a program of requirements in collaboration with other partners. Design (VO, DO, UO) in collaboration with other partners. Specific input in the field of "cost engineering", manufacturability, etc. Conducting research and drafting advice in collaboration with other partners. Development in 3-D/BIM* in collaboration with other partners. Drawing up a phasing plan / conversion plan in collaboration with other partners. Project management realization phase. Integral implementation coordination realization phase (planning, place, time and safety.) Project management realization phase; Planning management, Quality management, Safety management, Risk management, Document management, Environmental management and permit management. Work civil engineering, engineering. Phased delivery of documentation. Possibly. Temporary installations. Site engineering. Coordination realization phase**. Coordination with other plots.

Engineering and realization of mechanical engineering work including mechanical building-related installations.

Lot 3 Engineering and realization of mechanical engineering work, including mechanical building-related installations. (The list below is not exhaustive). Drawing up a program of requirements in collaboration with other partners. Design (VO, DO, UO) in collaboration with other partners. Specific input in the field of "cost engineering", manufacturability, etc. Conducting research and drafting advice in collaboration with other partners. Development in 3-D/BIM* in collaboration with other partners. Drawing up a phasing plan / conversion plan in collaboration with other partners. Project management realization phase. Project management realization phase; Planning management, Quality management, Safety management, Risk management, Document management, Environmental management and permit managementWork mechanical engineering, building-related installations. Phased delivery of documentation and CE markings. Temporary installations. Coordination realization phase**. Coordination with other plots.

Engineering and realization of electrical engineering activities including electrotechnical building-related installations.

Plot 4 Engineering and realization of electrotechnical, including electrotechnical building-related installations. (The list below is not exhaustive). Drawing up a program of requirements in collaboration with other partners. Design (VO, DO, UO) in collaboration with other partners. Specific input in the field of "cost engineering", manufacturability, etc. Conducting research and drafting advice in collaboration with other partners. Development in 3-D/BIM* in collaboration with other partners. Drawing up a phasing plan / conversion plan in collaboration with other partners. Project management realization phase. Project management realization phase; Planning management, Quality management, Safety management, Risk management, Document management, Environmental management and permit management. Activities electrical engineering including electrical building-related installations. Phased delivery of documentation and CE markings. Temporary installations. Coordination with other plots.

Independent supervision, technical management / management realization phase.

Lot 5 Independent supervision, technical management / management realization phase (The list below is not exhaustive).

Testing the estimates for market compliance during the construction team phase. Draw up a second opinion of (parts of) the design on request. Independently monitor the quality and health and safety and structural safety of the realization phase. Management realization phase. Reporting.Document management.Testing of fulfilled and amended working documents.

Download full details as .pdf
The Buyer:
Waterschap De Dommel
CPV Code(s):
45220000 - Engineering works and construction works
45232420 - Sewage work
45315100 - Electrical engineering installation works
45351000 - Mechanical engineering installation works
71247000 - Supervision of building work
71300000 - Engineering services
71322000 - Engineering design services for the construction of civil engineering works
71333000 - Mechanical engineering services
71520000 - Construction supervision services