Construction project: fire protection renovation of the ZDF Mainz high-rise building,
main measures
Work: natural stone and tile work 5.-16. construction phase
Construction time expected to be 05 / 2020-12 / 2024.
Type and scope of services:
Natural stone slabs
(Muschelkalk d = 4 cm, plate formats 2.00 x 0.60 m and 0.80 x 0.60 m with decorative profile across U-profile steel, on the UK consisting of support anchor with horizontal holding mandrel, made of stainless steel), whole undamaged panels that are not reused, handover to the ZDF niche meeting rooms:
- approx. 224 m
- approx. 80 m
- approx. 26 m
- approx. 26 m
- approx. 2 270 pieces separating cut UK.
Fire compartment doors
- about 155 m
- approx. 25 m
- approx. 15 m
- approx. 15 m
- approx. 1 175 pc separating cut UK.
Bauabschnittstrennung / kitchens:
- approx. 80 m
Fire compartment doors including new boreholes for the UK.
Reassemble after installing new fire compartment doors.
- approx. 545 m
- approx. 755 pieces separating cut UK.
General planner - architects - engineers
16-2401_324-2-3_Naturstein- und Fliesenarbeiten 5.-16.BA_Anlage for advance notice page
Adaptation to new door systems:
- approx. 65 m
Area wall axis 14-15:
- approx. 12 m
- approx. 110 pc separating cut UK.
Area elevator cores 1st floor:
- approx. 110 m
- approx. 870 pc separating cut UK.
Replacement of damaged plates:
- approx. 70 disassembly plates including UK and disposal,
- Reassemble approx. 70 panels stored on site.