The order includes the object planning services of the service profile buildings and interiors according to § 33 ff HOAI in connection with Annex 10 HOAI, service phases 6 to 9 for the facade renovation of the high school in Eckental.
The facade from the construction period of the high school in Eckental has been showing deficits in various respects for several years (jamming sun protection, susceptibility to storms, moisture problems inside).
Damage and cracks have appeared in the facade surface in recent years. Different variants of the renovation were examined in the design planning. The overall replacement of the facade was decided as a variant to be implemented. According to the enclosed design plans, the new facade was not planned with a weather shell as presented in the existing building.
The funding application has already been drawn up. A funding notice is not yet available.
According to the cost calculation (as of December 2019), the costs for cost groups 300 to 500 are gross at around EUR 2.95 million.
The service must begin immediately after the order has been placed. There is currently no funding approval. Construction is scheduled to start in September 2020.