Heating, ventilation and sanitary installation sports hall.
Heating installation power:
— sports floor heating for 285 m
— 14 x radiators for changing rooms, toilets and adjoining rooms with steel tube radiators,
— connection to existing heating system.
Ventilation installation performance:
— 6 x ventilation systems for toilet and shower rooms, separately roofing led according to DIN 18017-3.
Plumbing performance:
— 5 x toilet units; 7 x washbasins; 3 x urinals; 1 x toilet; 6 x shower systems and 2 x pouring basins,
— connection to existing drinking water supply.