Construction of refrigeration system with cold water network, chiller, distributor, pressure maintenance
Short description 8106 Refrigeration system BT A-D
Type and scope of the object of the order:
The construction project involves the renovation, modernization and expansion of the wish spa in Winnenden.
Here especially the refrigeration system for the components A-D main building and course pool
Main building Renovation and extension: Two-storey and partial basement
New course pool: single-storey with basement
Chiller
• Construction of a cold water network 14/18 °C (to avoid condensation)
• Central chiller (approx. 60 kW) and dry cooler
• 1 refrigeration distributor and accessories (approx. 7 outlets of different dimensions)
• Pressure maintenance and degassing for the new network
Built-in parts:
• A total of approx. 65 valves/fittings (string shut-off, balancing valves, shut-off valves, check valves)
• Fittings for motorized control valves (2 & 3 ways), as well as installation of MSR provided valves
• Approx. 12 circulation pumps
• Approx. 1,000 m pipes black steel pipe coated 2-fold DN 15 – DN 80 with thermal insulation and fittings
• Approx. 7 pcs 2-wire recirculating fan coil units for cooling technical rooms; incl. accessories
Performance dates:
Execution period: May 2023 to May 2024
Completion of new opening 01.06.2024