Performing painting work
Remove release agent mechanically, new walls and walls. Ceilings 700.00 sqm
Old coatings, load-bearing, prepare for recoating 7 310.00 sqm
Caustic + grinding AK, staircase / pedestal 135.00 square meters
Glue paint, non-waterproof coating remove 5 300.00 sqm
Mechanically remove lots of old paint 5 000,00 sqm
Remove old paint by stripping 125.00 sqm
Eliminate damaged joints in precast concrete floors 1 340.00 m
Repair damaged precast concrete elements, = 0,01 sqm 200,00 pcs.
Primer with solvent-free dispersion primer 5 500.00 sqm
Partial filling of primed areas 4 500.00 sqm
Filling of min. Surfaces, Q2, single-layer 2 000,00 m
Extra charge leveling for a further layer, surface quality Q3 1 500.00 m
Woodchip, structure medium, furnish and wallpaper, walls 8 285.00 sqm
Woodchip, structure fine, furnish and paper, ceilings 3 745.00 sqm
Primer / Tiefgrund ELF, walls 22 850.00 sqm
Primer / Tiefgrund ELF, ceilings 10 700.00 sqm
Check substrate / emulsion paint, matt, NAB class 2, walls 19 930.00 sqm
Check substrate / emulsion paint, matt, NAB class 2, ceilings 9 310.00 sqm
Allowance for lightly tinted finish, walls 8 874.00 sqm
Supplement for medium toned version 8 874.00 sqm
Allowance for richly toned version 8 874.00 sqm
Check substrate / emulsion paint, silk gloss NAB class 1 walls 5,070.00 sqm
Check substrate / emulsion paint, silk gloss NAB class 1 ceilings .185.00 sqm
Erstbeschichtung Stahlumfassungszargen 750,00 pcs.
Renewal coating pedestal rail steel rod 2.160 / 735 mm, inside, primed steel, 2 x alkyd varnish 23.00 pc.
Renovation coating Stair railing Steel bar 2,500 / 754 mm, inside, steel primed, 2 x alkyd resin paint 46,00 pcs.
Renewal coating Connecting part Stair railing Steel rod, inside, primed steel, 2 x alkyd varnish 48.00 pc.
Graphic applications 2,8 / 2,8 m 70,00 pc.
Color separation of surfaces 4 152.00 m
Seal connection joint Sealant acrylic 6 500.00 m
Seal connection joint Sealant silicone 2,300.00 m
Steps, risers, pedestals and stair stringers sweep 355.00 m2