The school administration office of the city Augsb. intends the modernization u. the reconstruction of Löweneck Grund- u. Middle school with integrated gymnasiums in Oberhausen. The school is being modernized in 4 stages.
The main positions listed with approx.
- 1 pc meter,
- 4,800 m empty pipes,
- 1 000 m conduits under the floor slab,
- 250 St. Junction boxes,
- 1 725 St. switch boxes,
- 450 m cable tray,
- 34,500 m of cable,
- 27 pieces UV,
- 1,500 pieces of installation equipment UP,
- 100 pieces of installation equipment AP,
- 50 pcs. KLB,
- 350 pieces of fire barriers,
- 1 100 pieces of lighting fixtures,
- 1 pc. Central battery with substation,
- 250 pcs emergency lights,
- 30 pc.
- 160 St. derivatives,
- 1 ELA system with 140 loudspeakers,
- 9 St. data distributor,
- 45 pcs speaker set,
- Wiring BMA 4 000 m,
- data line network 25 000 m,
- 350 data cans,
- 800 meters of fiber optic cabling,
- 140 pieces splice,
- 380 measurements.
Disassembly u. Sicherungsmaßn. to maintain school operations.
The school administration office of the city Augsb. intends the modernization u. the reconstruction of Löweneck Grund- u. Middle school with integrated gymnasiums in Oberhausen. The school is being modernized in 4 stages.
The main positions listed with approx.
- 1 pc meter,
- 4,800 m empty pipes,
- 1 000 m conduits under the floor slab,
- 250 St. Junction boxes,
- 1 725 St. switch boxes,
- 450 m cable tray,
- 34,500 m of cable,
- 27 pieces UV,
- 1,500 pieces of installation equipment UP,
- 100 pieces of installation equipment AP,
- 50 pcs. KLB,
- 350 pieces of fire barriers,
- 1 100 pieces of lighting fixtures,
- 1 pc. Central battery with substation,
- 250 pcs emergency lights,
- 30 pc.
- 160 St. derivatives,
- 1 ELA system with 140 loudspeakers,
- 9 St. data distributor,
- 45 pcs speaker set,
- Wiring BMA 4 000 m,
- data line network 25 000 m,
- 350 data cans,
- 800 meters of fiber optic cabling,
- 140 pieces splice,
- 380 measurements.
Disassembly u. Sicherungsmaßn. to maintain school operations.