Implementation planning, preparation and participation in the awarding of contracts
LPh. 5-8 + local construction supervision
The aim of the planning is to construct the motorway's own continuous cable system, which consists of two cable conduits HD-PE 50x4.6 and one cable conduit HD-PE 110x6.3. Due to the obligation to co-lay according to TKG, this is supplemented by two further cable conduits HD-PE 50x4.6 and one cable conduit HD-PE 110x6.3.
Two 48-fibre fibre optic cables for the transport cluster and the access network will be installed in the two motorway-owned d50s, and five HD-PE 12.0x1.1 micro-cable conduits will be installed in each of the two d50s according to TKG. The two d110s serve as a reserve.
Due to the planned 6-lane expansion, only the motorway's own route will be built between Str.km 480.610 and the Regensburg junction. The measure is located on the A3 motorway Nuremberg - Regensburg - Passau - (Linz) between the Parsberg junction and the Regensburg motorway junction, more precisely between Str.km 455.190 (A3_900_0.184) and road km 491.604 (A3_1000_2.756) as well as on the A93 Regensburg - Holledau between the Regensburg junction and the Regensburg-Süd motorway junction, more precisely between km 200.000 (A93_980_0.853) and Str.km 202.147 (A93_1020_0.233).
The Kabelhaus Parsberg is located at Str.km 455,190 (A3_900_0,184) at the Parsberg junction of the same name. The Pollenried motorway maintenance depot is located at Str.km 479.705 (A3_960_7.259) and the Pentling motorway maintenance depot is located on the A93 at the Re-gensburg-Süd junction (A93_1020_0.233).
The relocation will take place along the A3 at the Nuremberg carriageway and will cross the A3 at the Regensburg junction. From there, the route runs along the Holledau carriageway to the Re-gensburg-Süd motorway, where it crosses the A93 to the Pentling motorway maintenance depot.
The planned project has a total length of 40 km, of which 25.1 km will be built in construction phase 1 and 14.9 km in construction phase 2.
Local construction supervision is mandatory and must be offered in addition to work phase 8.