With the purchase of the former municipal school building by the city in 2016, the opportunity arises to develop the site of the listed former cloister wing of the Franciscan monastery from the 13th century and the school building from the 19th century into a place for culture and education. The building, which was used from 1995 to 2016 as the administration building of the Allgemeine Ortskrankenkasse (AOK), takes over the infrastructure necessary for the exam wing. As a result, the intervention in the listed substance can be minimized. It also enables barrier-free access to the upper floor of the cloister wing, also connected to the old school. The new connecting building between the new library and the old cloister building traces the course of the former apse.
As a replacement for the demolished part of the building from the 1980s, a new extension in conventional masonry with concrete ceilings will be built in the same width, but adapted to the length of the former schoolhouse.
Construction of the rainwater drainage pipeline
The construction of the rainwater drainage pipe is carried out using the cut-and-cover method in the town of Gransee in Klosterstraße on the property of the monastery with the following services:
1.00 flat rate to set up a construction site
1.00 Clearing the construction site as a lump sum
1.00 flat rate for traffic safety
Pick up and re-lay 13.00 m² of concrete block paving
Pick up and re-lay 21.00 m² of small stone paving
69.00 m³ Construct a pipe trench
42.00 m Kunststoffrohrleitung DN 200 KG repair
19.00 m Connecting cable DN 150 KG
Backfill 61.00 m pipeline zone
2,00 pcs. Manufacture plastic shafts DN 400
42.00 m Execute camera passage DN 200
42.00 m Perform leak test DN 200