The phase 2 project consists of: supplying and installing the overspeed vane, the valve, the hollow jet and the piping (made of GRP (plastic material) or steel) of the new low-flow line in Fabrèges. The hollow jet will be installed in a room (GC part). The phase 1 project consisted of: supplying and installing the DN700 tapping and the DN700 valve (and solid floor + hydraulic power unit)
Supplies: overspeed vane, valve, hollow jet, piping (GRP (plastic) and/or steel) - Services: creation of local hollow jet - Works: installation of piping and accessories