A simple turnout EW 54-190-1: 9 B according to the DB standard is to be manufactured and delivered. The switch is to be installed as a construction switch 62 in the track of the line 1117 in the kilometer direction behind the EÜ via the B 75 Lübeck-Kücknitz. The installation will take place during a closed period at Easter 2021.
A simple turnout EW 54-190-1: 9 B according to the DB standard is to be manufactured and delivered.