Lot 1 Expansion of existing switchgear in the Gesundbrunnenstraße switchgear Expansion of reserve cell =J10 Medium voltage 20kV as compact switching cell Conversion of coupling field =J07 Medium voltage 20kV as copcacted switching cell The new switching cells must be identical to the existing system.
Lot 2 New construction of medium-voltage switchgear and medium-voltage work for the industrial park 1 piece of walk-in medium-voltage switch house in compact design with 13 MS cells, 240kVA transformer and a low-voltage switchgear 1,400m cable NAYY-J 4x240 13,000m cable Uo/U 12/20kV Around 24kV NA2XS(FL)2Y 1x300RM/25 3,000m cable Uo/U 12/20kV Around 24kV NA2XS(FL)2Y 1x240RM/25 1Pcs compact transformer station 630kVA div. Connection work in the medium voltage range
Development work in the medium voltage range 20kV to the Pasewalk-Szczecin Industrial ParkLot 1 Expansion of existing switchgear in the Schalthaus Gesundbrunnenstraße Expansion of reserve cell =J10, =J06 Medium voltage 20kV as compact switching cell Conversion of coupling field =J07 Medium voltage 20kV as copcacted switching cell The new switching cells must be identical to the existing system.
Development work in the medium voltage range 20kV to the Pasewalk-Szczecin Industrial Park1 piece walk-in medium-voltage switchgear in compact design with 13 MS cells, 240kVA transformer and a low-voltage switchgear 1,400m cable NAYY-J 4x240 13,000m cable Uo/U 12/20kV Around 24kV NA2XS(FL)2Y 1x300RM/25 3,000m cable Uo/U 12/20kV Around 24kV NA2XS(FL)2Y 1x240RM/25 1piece compact transformer station 630kVA div. Connection work in the medium voltage range