Modernization Stadthalle Karlsruhe - LV 12.8 Civil Engineering and Paved Surfaces

Modernization of the Stadthalle Karlsruhe:

Execution of civil engineering and paved surfaces

Pipeline trench and excavation pit

approx. 200 m Construction of a pipeline trench 1.2m wide, 1.2m deep with a sand bed by means of shoring and manual shaft in the area of pipeline routing and tree roots

approx. 150 m3 disposal excavation

approx. 7 pcs excavation pit 5x5mx2.7m deep around well borehole with RCL

Bedding and compaction for wellhead prefabricated installation

approx. 2 pcs excavation pit 2x2x2m connection pipe entry building

Removal, storage and reinstallation of paved surfaces and production of new surfaces

Dismantling:

Pick up approx. 600 m² of concrete block pavement, clean it and store it on the property

Pick up approx. 300 m² of natural stone pavement, clean it and store it on the property

Pick up and dispose of approx. 20 m of damaged curbs

Dismantle approx. 5 manhole covers and store them on the property

Dismantle approx. 20 m of drainage channels and store them on the property

Replacement:

approx. 120 m² of new concrete block paving laid in bedding on base course

Approx. 480 m² of concrete block paving from storage site to bedding on base course

approx. 60 m² of new natural stone paving laid in bedding on base course

approx. 220 m² of natural stone paving from storage site to bedding on base course

Lay approx. 150 m² of top layer of sand-chippings mixture on a dynamic layer and base course

approx. 20 m installation of deep shelves

approx. 20 m insertion of new drainage channels

Well water shaft head structures

approx. 3 pcs extraction well shaft head as a prefabricated part consisting of

- Rectangular shaft clear dimension 2.4m x 1.6m x 2.0m (LxWxH) with

Recess in base plate 1x DN800 and 1x DN100

Recess wall pipe entry 1x DN250, 4x DN200

and 10x shaft stairs

- Cover plate SLW30 suitable for rectangular shaft with

Annular gap seal and annular shaft connection DN625

- Ring shaft DN625 400mm high

- Ring shaft lid SLW30 tight

- Steel truss IPE 100 over short shaft side with two

Head plates for wall mounting, centered over floor recess

DN800 to accommodate a chain hoist

- Well overflow slide flange DN 800 made of V4A for production

Transition between well filter pipe and shaft

- Manhole flange cover V4A DN 800 with coulters for 2x

Pump pipe flange DN80 (flange plate DN 200 for

Screw connection with flange cover with pipe flange at the top and

DN80, V4A) and 1x pump pipe flange DN50

(Flange plate DN 150 for screw connection with flange cover with

Pipe flange above and below DN50, V4A)

approx. 4 pcs swallowing well shaft head as a prefabricated part consisting of

- Rectangular shaft clear dimension 2.4m x 1.6m x 2.0m (LxWxH) with

Recess in base plate 1x DN800

Recess wall pipe entry 1x DN250, 3x DN200

and 10x shaft stairs

- Cover plate SLW30 suitable for rectangular shaft with

Annular gap seal and annular shaft connection DN625

- Ring shaft DN625 400mm high

- Ring shaft lid SLW30 tight

- Steel truss IPE 100 over short shaft side with two

Head plates for wall mounting, centered over floor recess

DN800 to accommodate a chain hoist

- Well overflow sliding flange DN 600 made of V4A for production

Transition between well filter pipe and shaft

- Manhole flange cover V4A DN 600 with coulters for 1x

Return pipe flange DN80 (flange plate DN 200 for

Screw connection with flange cover with pipe flange at the top and

below DN80, V4A)

Download full details as .pdf
The Buyer:
Stadt Karlsruhe
CPV Code(s):
45112100 - Trench-digging work
45221230 - Shafts
45232451 - Drainage and surface works