The city of Konz is planning a comprehensive upgrading and renovation of the monastery Karthaus in 3 construction phases.
As part of the basic determination for TGA, it is necessary to dismantle the existing passenger elevator with subsequent measurement of the elevator shaft. The expected execution period is the 34th week to the 37th week 2023
The main masses of the trade are composed as follows:
- Dismantling of the existing elevator
- Measurement of the elevator shaft