Modernization of the Stadthalle Karlsruhe:
Execution of steel construction/metal construction work 3
approx. 118 m platform construction for HEA 140 dry cooler
approx. 23 m platform construction for dry cooler NEA HEA 140
approx. 27 m platform overall construction for HVAC systems HEA 140
approx. 28 m platform construction for control cabinet NO IPE 140
approx. 27 m Overall platform construction for control cabinet SO IPE 140 approx. 2 pcs gratings Control cabinets
approx. 21 m² aluminium substructure for control cabinets, walls, roofs
approx. 21 m² smooth sheet metal façade for control cabinets, walls, roofs
approx. 23 m Eckprofile
approx. 12 m substructure fire gas fan, UNP 100
approx. 5 bars Dach_E+3 in front of exit doors
approx. 2 pcs roof hoods consisting of UK, stiffening, trapezoidal sheeting,
Connection angle and drainage
ca. 2 St Gitterrostebene E08
approx. 151 m section steel beam IPE 120
approx. 323 pcs Joint section steel beam IPE 120
approx. 230 m² grating
approx. 343 m steel railing, handrail and knee strip
1 St Fixed safety ladder with back protection, inside
approx. 2 pcs console for gas cooler
1 pcs grating
ca. 4 St U Profilträger U 140, rundkantig
1 St steel stringer staircase straight single-flight with platform
1 pc handrail wall-mounted
approx. 240 m railings on bridges and stairs made of sheet steel closed
approx. 240 m Dismantling and disposal of existing railings
(post and handrail, without filling)
approx. 80 m screen as T-profile
approx. 80 m spacer as UA profile
approx. 80 m metal bracket as L-profile
approx. 160 m metal profile as U-profile
approx. 90 m stainless steel impact protection