The confidentiality agreement can be downloaded from https://bis-fx.transnetbw.de/portal-seefx/~/f8d10fff-0164-4483-ae91-27a2fe257fd1?download. For a complete review of the documents, please send the signed confidentiality to eu-ausschreibung@transnetbw.de
This call for tender for WAFB 3.0 suitability test AR 6: Expert examination for influence on neighboring infrastructure (WAFB = weather-dependent overhead line operation), includes the expert review of neighboring infrastructures for limit value exceedances due to inductive influence by transmission systems of TransnetBW and preloads:
• WP 0: Project organizations
• WP 1: Preparation for the review of neighboring infrastructures
• WP 2: Checking the influence of neighboring infrastructures
• WP 3: Documentation of the review including discussion of the results
WAFB 3.0 - AR 6 suitability test: Expert review for influence on neighboring infrastructureThis call for tender for WAFB 3.0 suitability test AR 6: Expert examination for influence on neighboring infrastructure (WAFB = weather-dependent overhead line operation), includes the expert review of neighboring infrastructures for limit value exceedances due to inductive influence by transmission systems of TransnetBW and preloads:
• WP 0: Project organizations
• WP 1: Preparation for the review of neighboring infrastructures
• WP 2: Checking the influence of neighboring infrastructures
• WP 3: Documentation of the review including discussion of the results
For more information, see document AR6: CHECK FOR INFLUENCE OF NEIGHBORING INFRASTRUCTURE CONTRACT FOR PROCESSING OF ORDER; COMPOSITION OF LOT ALLOCATION
WAFB 3.0 - AR 6 suitability test: Expert review for influence on neighboring infrastructureThis call for tender for WAFB 3.0 suitability test AR 6: Expert examination for influence on neighboring infrastructure (WAFB = weather-dependent overhead line operation), includes the expert review of neighboring infrastructures for limit value exceedances due to inductive influence by transmission systems of TransnetBW and preloads:
• WP 0: Project organizations
• WP 1: Preparation for the review of neighboring infrastructures
• WP 2: Checking the influence of neighboring infrastructures
• WP 3: Documentation of the review including discussion of the results
For more information, see document AR6: CHECK FOR INFLUENCE OF NEIGHBORING INFRASTRUCTURE CONTRACT FOR PROCESSING OF ORDER; COMPOSITION OF LOT ALLOCATION
WAFB 3.0 - AR 6 suitability test: Expert review for influence on neighboring infrastructureThis call for tender for WAFB 3.0 suitability test AR 6: Expert examination for influence on neighboring infrastructure (WAFB = weather-dependent overhead line operation), includes the expert review of neighboring infrastructures for limit value exceedances due to inductive influence by transmission systems of TransnetBW and preloads:
• WP 0: Project organizations
• WP 1: Preparation for the review of neighboring infrastructures
• WP 2: Checking the influence of neighboring infrastructures
• WP 3: Documentation of the review including discussion of the results
For more information, see document AR6: CHECK FOR INFLUENCE OF NEIGHBORING INFRASTRUCTURE CONTRACT FOR PROCESSING OF ORDER; COMPOSITION OF LOT ALLOCATION
WAFB 3.0 - AR 6 suitability test: Expert review for influence on neighboring infrastructureThis call for tender for WAFB 3.0 suitability test AR 6: Expert examination for influence on neighboring infrastructure (WAFB = weather-dependent overhead line operation), includes the expert review of neighboring infrastructures for limit value exceedances due to inductive influence by transmission systems of TransnetBW and preloads:
• WP 0: Project organizations
• WP 1: Preparation for the review of neighboring infrastructures
• WP 2: Checking the influence of neighboring infrastructures
• WP 3: Documentation of the review including discussion of the results
For more information, see document AR6: CHECK FOR INFLUENCE OF NEIGHBORING INFRASTRUCTURE CONTRACT FOR PROCESSING OF ORDER; COMPOSITION OF LOT ALLOCATION
WAFB 3.0 - AR 6 suitability test: Expert review for influence on neighboring infrastructureThis call for tender for WAFB 3.0 suitability test AR 6: Expert examination for influence on neighboring infrastructure (WAFB = weather-dependent overhead line operation), includes the expert review of neighboring infrastructures for limit value exceedances due to inductive influence by transmission systems of TransnetBW and preloads:
• WP 0: Project organizations
• WP 1: Preparation for the review of neighboring infrastructures
• WP 2: Checking the influence of neighboring infrastructures
• WP 3: Documentation of the review including discussion of the results
For more information, see document AR6: CHECK FOR INFLUENCE OF NEIGHBORING INFRASTRUCTURE CONTRACT FOR PROCESSING OF ORDER; COMPOSITION OF LOT ALLOCATION
WAFB 3.0 - AR 6 suitability test: Expert review for influence on neighboring infrastructureThis call for tender for WAFB 3.0 suitability test AR 6: Expert examination for influence on neighboring infrastructure (WAFB = weather-dependent overhead line operation), includes the expert review of neighboring infrastructures for limit value exceedances due to inductive influence by transmission systems of TransnetBW and preloads:
• WP 0: Project organizations
• WP 1: Preparation for the review of neighboring infrastructures
• WP 2: Checking the influence of neighboring infrastructures
• WP 3: Documentation of the review including discussion of the results
For more information, see document AR6: CHECK FOR INFLUENCE OF NEIGHBORING INFRASTRUCTURE CONTRACT FOR PROCESSING OF ORDER; COMPOSITION OF LOT ALLOCATION
WAFB 3.0 - AR 6 suitability test: Expert review for influence on neighboring infrastructureThis call for tender for WAFB 3.0 suitability test AR 6: Expert examination for influence on neighboring infrastructure (WAFB = weather-dependent overhead line operation), includes the expert review of neighboring infrastructures for limit value exceedances due to inductive influence by transmission systems of TransnetBW and preloads:
• WP 0: Project organizations
• WP 1: Preparation for the review of neighboring infrastructures
• WP 2: Checking the influence of neighboring infrastructures
• WP 3: Documentation of the review including discussion of the results
For more information, see document AR6: CHECK FOR INFLUENCE OF NEIGHBORING INFRASTRUCTURE CONTRACT FOR PROCESSING OF ORDER; COMPOSITION OF LOT ALLOCATION
WAFB 3.0 - AR 6 suitability test: Expert review for influence on neighboring infrastructureThis call for tender for WAFB 3.0 suitability test AR 6: Expert examination for influence on neighboring infrastructure (WAFB = weather-dependent overhead line operation), includes the expert review of neighboring infrastructures for limit value exceedances due to inductive influence by transmission systems of TransnetBW and preloads:
• WP 0: Project organizations
• WP 1: Preparation for the review of neighboring infrastructures
• WP 2: Checking the influence of neighboring infrastructures
• WP 3: Documentation of the review including discussion of the results
For more information, see document AR6: CHECK FOR INFLUENCE OF NEIGHBORING INFRASTRUCTURE CONTRACT FOR PROCESSING OF ORDER; COMPOSITION OF LOT ALLOCATION
WAFB 3.0 - AR 6 suitability test: Expert review for influence on neighboring infrastructureThis call for tender for WAFB 3.0 suitability test AR 6: Expert examination for influence on neighboring infrastructure (WAFB = weather-dependent overhead line operation), includes the expert review of neighboring infrastructures for limit value exceedances due to inductive influence by transmission systems of TransnetBW and preloads:
• WP 0: Project organizations
• WP 1: Preparation for the review of neighboring infrastructures
• WP 2: Checking the influence of neighboring infrastructures
• WP 3: Documentation of the review including discussion of the results
For more information, see document AR6: CHECK FOR INFLUENCE OF NEIGHBORING INFRASTRUCTURE CONTRACT FOR PROCESSING OF ORDER; COMPOSITION OF LOT ALLOCATION
WAFB 3.0 - AR 6 suitability test: Expert review for influence on neighboring infrastructureThis call for tender for WAFB 3.0 suitability test AR 6: Expert examination for influence on neighboring infrastructure (WAFB = weather-dependent overhead line operation), includes the expert review of neighboring infrastructures for limit value exceedances due to inductive influence by transmission systems of TransnetBW and preloads:
• WP 0: Project organizations
• WP 1: Preparation for the review of neighboring infrastructures
• WP 2: Checking the influence of neighboring infrastructures
• WP 3: Documentation of the review including discussion of the results
For more information, see document AR6: CHECK FOR INFLUENCE OF NEIGHBORING INFRASTRUCTURE CONTRACT FOR PROCESSING OF ORDER; COMPOSITION OF LOT ALLOCATION
WAFB 3.0 - AR 6 suitability test: Expert review for influence on neighboring infrastructureThis call for tender for WAFB 3.0 suitability test AR 6: Expert examination for influence on neighboring infrastructure (WAFB = weather-dependent overhead line operation), includes the expert review of neighboring infrastructures for limit value exceedances due to inductive influence by transmission systems of TransnetBW and preloads:
• WP 0: Project organizations
• WP 1: Preparation for the review of neighboring infrastructures
• WP 2: Checking the influence of neighboring infrastructures
• WP 3: Documentation of the review including discussion of the results
For more information, see document AR6: CHECK FOR INFLUENCE OF NEIGHBORING INFRASTRUCTURE CONTRACT FOR PROCESSING OF ORDER; COMPOSITION OF LOT ALLOCATION