Sprinkenhof GmbH intends to
Hamburg State Opera a renovation of its buildings for spectators and audiences
Stage house and company building at Große Theaterstrasse 25.
The elevator in the stage house will be completely renewed.
The elevator in the auditorium will be extensively renewed. The existing landing doors will be taken over and the existing engine room will no longer be used.
Both elevator systems will be renewed in parallel and exclusively during the specified period (break in 2024).
Essentially, the following plant components are to be delivered and assembled:
2 stage management consoles with rack center, intercom, radio equipment, etc.,
3G video system with 27 cameras,
110 monitors,
approx. 150 junction boxes and junction boxes,
approx. 36km of cables and wires,
100V call system with approx. 406 loudspeakers, traffic lights