Open-air facilities civil engineering works
VE 502 work to be performed:
• BE for own services of the respective construction stages and construction fields
• Soil excavation work approx. 3,050 m3
• waterproofing work on local concrete bridge structure 895m²
• covering areas on underbuilt areas and non-substructure areas
• Asphalt BK3,2-10 approx.: 3,150 m²
• concrete block paving coverings approx. 4,700m²
• Workspace filling by blowing substrates approx. 3,500 m³
• in-situ concrete retaining walls made of reinforced concrete approx. 95m³
• stair systems made of concrete block steps
• Earthworks for pipeline and ground pipe laying (media: rainwater, utility water and electricity)
• Installation of rainwater pipes including shaft structures: approx. 560m
• Laying live cables approx.2.050m
• erection of lighting devices mast luminaires and bollard lights
• Fall protection: 400m
• Handrails: 60m
• Production and construction of freestanding canopies 5 pcs.
• precast concrete seat elements approx. 275 pcs.
• 25 pcs bollard lights; 40 pcs wall lamps; 35 mast top lights