The subject of the order is a construction work entitled:
Construction of bicycle paths within the framework of the action to reduce air pollution and the development of urban mobility:
Construction of the designed western beltway John Paul II in Płońsk from km 1 + 015 to km 2 + 817.81 length of 1802.81 m and
Construction of the internal ring road of the center of the city of Płońsk km 0 + 000 - 0 + 650,72.
The ordering party in accordance with art. 24 aa of the Public Procurement Law Act, it informs that it will first evaluate the offers and then examine whether the Contractor, whose offer has been evaluated as the most advantageous, is not subject to exclusion and meets the conditions for participation in the proceedings.
The subject of the order is a construction work entitled:
Construction of bicycle paths within the framework of the action to reduce air pollution and the development of urban mobility:
Construction of the designed western beltway John Paul II in Płońsk from km 1 + 015 to km 2 + 817.81 length of 1802.81 m and
Construction of the internal ring road of the center of the city of Płońsk km 0 + 000 - 0 + 650,72.
Range of the subject of the contract:
Construction of the designed western beltway John Paul II in Płońsk from km 1 + 015 to km 2 + 817.81 length 1802.81 m.
The subject of the order is Construction of the designed western beltway John Paul II in Płońsk from km 1 + 015 to km 2 + 817.81 length 1802.81 m; involves the execution of demolition works, earthworks, construction of road surfaces, pavements, bicycle paths, construction of an engineering building (bridge) on the Płonka River, construction of collision-free intersections, storm water drainage, lighting, vertical and horizontal marking on the investment section, equipment technical infrastructure, teletechnical infrastructure, greenery and land development within the designed beltway.
The task will start from the roundabout on ul. Płocka in km 1 + 015, end of the connection with the poviat road ul. Youth in km 2 + 817.81; total length of the beltway 1802.81 m
The detailed scope of the contract is provided in Annex 4 to the Terms of Reference under the name: Detailed description of the subject of the order.
Construction of the internal ring road of the center of the city of Płońsk km 0 + 000 - 0 + 650,72.
The subject of the order is the execution of construction works consisting in the construction of the internal bypass of the center of the city of Płońsk. The construction of the designed internal bypass involves the execution of demolition works, earthworks, construction of road surfaces, pavements, bicycle paths, the construction of a roundabout intersection at the intersection of Wolności and Grunwaldzka streets, rainwater drainage, lighting, vertical and horizontal signs, greenery and development terrain within the designed bypass.
The task begins near the intersection with Żołnierzy Wyklętych street (km 0 + 083,50), and ends at Grunwaldzka street near the intersection with Wolności street (km 0 + 650.72). The total length of the beltway is 650.72 m, of which to completion, according to the given picket is 567.22 m. The detailed scope of the contract is provided in Annex 4 to the Terms of Reference under the name: Detailed description of the subject of the contract.