Technical Assistance Contract for the Development of the Thionville Wastewater Treatment Plant | Tenderlake

Technical Assistance Contract for the Development of the Thionville Wastewater Treatment Plant

Contract Value:
EUR 420K - 420K
Notice Type:
Contract Notice
Published Date:
16 June 2026
Closing Date:
20 July 2026
Location(s):
FRF33 Moselle (FR FRANCE)
Description:
The project involves providing technical assistance for the development of the Thionville Wastewater Treatment Plant, focusing on expanding its capacity and implementing a methanization solution while ensuring continuous treatment operations.

The environmental site for the treatment of wastewater in Thionville is operated under a public service delegation by VEOLIA until December 31, 2030. It is designed for a nominal capacity of 80,000 EH and treats the effluents from the municipalities of Basse-Ham, Kuntzig, Manom, Terville, Thionville, and Yutz. While evolving its treatment capacity to 100,000 EH, Thionville Fensch Agglomeration is considering a methanization solution to improve the recovery of the sludge produced by the plant, while injecting biomethane into the GRDF network. The wastewater treatment facility cannot be stopped. Treatment continuity must be ensured at all times. The Technical Assistance to Project Management (ATMO) consists of 5 phases: Phase 1: Assimilation of preliminary studies and establishment of pre-programs; Phase 2: Assistance for obtaining administrative authorizations; Phase 3: Programming; Phase 4: Preparation and awarding of contracts; Phase 5: Assistance within the framework of a design-build type contract. The details of the missions by phase of the operation are included in the specifications.


LOT-0000
S-PF-1835417
Technical Assistance Contract for the Development of the Thionville Wastewater Treatment Plant.
The environmental site for the treatment of wastewater in Thionville is operated under a public service delegation by VEOLIA until December 31, 2030. It is designed for a nominal capacity of 80,000 EH and treats the effluents from the municipalities of Basse-Ham, Kuntzig, Manom, Terville, Thionville, and Yutz. While evolving its treatment capacity to 100,000 EH, Thionville Fensch Agglomeration is considering a methanization solution to improve the recovery of the sludge produced by the plant, while injecting biomethane into the GRDF network. The wastewater treatment facility cannot be stopped. Treatment continuity must be ensured at all times. The Technical Assistance to Project Management (ATMO) consists of 5 phases: Phase 1: Assimilation of preliminary studies and establishment of pre-programs; Phase 2: Assistance for obtaining administrative authorizations; Phase 3: Programming; Phase 4: Preparation and awarding of contracts; Phase 5: Assistance within the framework of a design-build type contract. The details of the missions by phase of the operation are included in the specifications.

The Buyer:
Thionville Fensch Agglomération
Additional information:
Link:
Download Full Notice as PDF
Link:
View Full Notice
Link:
Additional document: 1835417
CPV Code(s):
71318000 - Advisory and consultative engineering services