Construction of Charging Stations for Emission-Free Public Transport Vehicles | Tenderlake

Construction of Charging Stations for Emission-Free Public Transport Vehicles

Contract Value:
CZK 189M - 189M
Notice Type:
Contract Notice
Published Date:
08 July 2026
Closing Date:
29 July 2026
Location(s):
CZ071 Olomoucký kraj (CZ Czech Republic/ČESKÁ REPUBLIKA)
Description:
The project entails constructing charging stations for electric buses at four locations, including necessary supplies, services, and preparation of construction design documentation in compliance with specific regulations.

The project involves the construction of charging stations (according to the PARTIAL AGREEMENT) for the acquired emission-free public transport vehicles - electric buses in four (4) locations (see PROJECT 1 to 4), including relevant supplies and services. The scope of construction work and supplies that the contracting authority anticipates will be necessary to implement is further specified in the PROJECT, while the subject of the public contract includes the preparation of construction design documentation to the extent required by specific implementing regulations on the Contractor's specific technical solution, including a list of works and bill of quantities in accordance with Decree No. 169/2016 Coll. The contracting authority requires that the solution executed by the Contractor for each Partial Project comply with the specific PERMIT. The public contract will be financed from the Integrated Regional Operational Programme 2021-2027 grant from the call for Filling and Charging Stations for Public Transport (SC 6.1).


LOT-0001
Construction of charging stations for emission-free public transport vehicles.
The project involves the construction of charging stations (according to the PARTIAL AGREEMENT) for the acquired emission-free public transport vehicles - electric buses in four (4) locations (see PROJECT 1 to 4), including relevant supplies and services. The scope of construction work and supplies that the contracting authority anticipates will be necessary to implement is further specified in the PROJECT, while the subject of the public contract includes the preparation of construction design documentation to the extent required by specific implementing regulations on the Contractor's specific technical solution, including a list of works and bill of quantities in accordance with Decree No. 169/2016 Coll. The contracting authority requires that the solution executed by the Contractor for each Partial Project comply with the specific PERMIT. The public contract will be financed from the Integrated Regional Operational Programme 2021-2027 grant from the call for Filling and Charging Stations for Public Transport (SC 6.1).

The Buyer:
Dopravní podnik města Olomouce, a.s.
Additional information:
Link:
View Full Notice
Link:
Additional document: Zadávací dokumentace v plném rozsahu.
Link:
Download Full Notice as PDF
CPV Code(s):
31000000 - Electrical machinery, apparatus, equipment and consumables; lighting
31200000 - Electricity distribution and control apparatus
45000000 - Construction work
45112700 - Landscaping work
45232221 - Transformer substation
45233100 - Construction work for highways, roads
45310000 - Electrical installation work
45311000 - Electrical wiring and fitting work
51112000 - Installation services of electricity distribution and control equipment
71200000 - Architectural and related services
71300000 - Engineering services