Within the scope of this public procurement, the following activities are included for each of the designated positions: Activity 1 – preparation of an investment project in the phase of technical project; Activity 2 – execution of construction and assembly works (CMR) according to the approved investment project; Activity 3 – exercising author supervision during construction. The full range of activities for each designated position is specified in the Technical Assignment, which also serves as the Design Assignment for commissioning the Investment project. Due to the nature of the project and the specificity of the activities, the contracting authority (the municipality) is a different entity from the owners of the intervention site, as it executes the commissioning based on the concluded contract. This procedure for each of the designated positions is launched under the conditions of Article 114 of the Public Procurement Act (ZOP), i.e., at the time of its initiation, funding has not been secured. The implementation of the activities and interventions included in the subject scope of this public procurement is anticipated to be financed under procedure BG16FFPR003 - 4.001 'Support for sustainable energy refurbishment of multi-family residential buildings, including addressing energy poverty' under Priority 4 of 'Just Transition' of the 'Regional Development' Program 2021-2027.
LOT-0002
'Implementation of energy efficiency measures, engineering - design, author supervision, and execution of construction and assembly works for 'Multi-family residential building in Kyustendil, 31 Ludmil Yankov St.'.
The following activities are included in the scope of this designated position: Activity 1 – Preparation of an investment project: Development of an investment project in the 'technical project' phase in accordance with Regulation No. 4 from 21. 05. 2001 on the scope and content of investment projects; When preparing the project, the selected contractor must comply with the mandatory measures for maintaining and securing the facility, prescribed in the Passport from the examination to establish the technical characteristics and in the Report for energy examination and the Certificate for energy characteristics of buildings in operation. Activity 2 – Execution of construction and assembly works for the construction of the site: The planned CMR includes all activities for energy refurbishment - for the application of EE measures and all activities for the application of the mandatory measures prescribed by the examination to establish the technical characteristics for the site, according to the developed investment project. The following energy-saving measures (ESM) are planned, detailed in the Certificate for energy characteristics of the building: ESM B1 – Replacement of window frames ESM B2 - Thermal insulation of external walls ESM B3 – Thermal insulation of the roof ESM B4 – Thermal insulation of the floor ESM C1 – Replacement of staircase lighting. Activity 3 – Exercising author supervision during construction, in accordance with Article 162 of the Spatial Planning Act. The construction falls under category three according to the Spatial Planning Act. Basic volumetric-planning and functional indicators. Built-up area: 989.48 m2 Total built-up area: 6929.36 m2 Number of floors: 7 above ground and 1 underground.
LOT-0001
'Implementation of energy efficiency measures, engineering - design, author supervision, and execution of construction and assembly works for 'Multi-family residential building in Kyustendil, 240, 242, 244, 246, 248 Tsar Osvoboditel St.'.
The following activities are included in the scope of this designated position: Activity 1 – Preparation of an investment project: Development of an investment project in the 'technical project' phase in accordance with Regulation No. 4 from 21. 05. 2001 on the scope and content of investment projects; When preparing the project, the selected contractor must comply with the mandatory measures for maintaining and securing the facility, prescribed in the Passport from the examination to establish the technical characteristics and in the Report for energy examination and the Certificate for energy characteristics of buildings in operation. Activity 2 – Execution of construction and assembly works for the construction of the site: The planned CMR includes all activities for energy refurbishment - for the application of EE measures and all activities for the application of the mandatory measures prescribed by the examination to establish the technical characteristics for the site, according to the developed investment project. The following ESM are planned and detailed in the Certificate for energy characteristics of the building: ESM B1 – Thermal insulation of external walls ESM B3 – Thermal insulation of the roof ESM B4 – Thermal insulation of the floor ESM B5 – Replacement of windows and doors ESM C12 – Measures for lighting. Activity 3 – Exercising author supervision during construction, in accordance with Article 162 of the Spatial Planning Act. The construction falls under category three according to the Spatial Planning Act. Basic volumetric-planning and functional indicators. Block 143 B Built-up area: 268 m2 Total built-up area: 1633.60 m2 Total area with basement: 1889.80 m2. Block 142 B Built-up area: 511.30 m2 Total built-up area: 3063.20 m2 Total area with basement: 3532.80 m2. Block 143 A Built-up area: 272 m2 Total built-up area: 2383.40 m2 Total area with basement: 2696.40 m2. Block 142 B Built-up area: 268.40 m2 Total built-up area: 2718.10 m2 Total area with basement: 3048.30 m2. Block 143 V Built-up area: 224.70 m2 Total built-up area: 1740.10 m2 Total area with basement: 1956.80 m2. Total built-up area: 1544.40 m2 Total area without basement: 11538.40 m2 Total area with basement: 13127.00 m2.
LOT-0003
'Implementation of energy efficiency measures, engineering - design, author supervision, and execution of construction and assembly works for 'Multi-family residential building in Kyustendil, 233, block 147 Tsar Osvoboditel St.'.
The following activities are included in the scope of this designated position: Activity 1 – Preparation of an investment project: Development of an investment project in the 'technical project' phase in accordance with Regulation No. 4 from 21. 05. 2001 on the scope and content of investment projects; When preparing the project, the selected contractor must comply with the mandatory measures for maintaining and securing the facility, prescribed in the Passport from the examination to establish the technical characteristics and in the Report for energy examination and the Certificate for energy characteristics of buildings in operation. Activity 2 – Execution of construction and assembly works for the construction of the site: The planned CMR includes all activities for energy refurbishment - for the application of EE measures and all activities for the application of the mandatory measures prescribed by the examination to establish the technical characteristics for the site, according to the developed investment project. The following ESM are planned and detailed in the Certificate for energy characteristics of the building: ESM B1 – Thermal insulation of external walls ESM B3 – Thermal insulation of the roof ESM B4 – Thermal insulation of the floor ESM B5 – Replacement of windows and doors EV – Supply and installation of a PV off-grid system 4.10 kWp. Activity 3 – Exercising author supervision during construction, in accordance with Article 162 of the Spatial Planning Act. The construction falls under category three according to the Spatial Planning Act. Basic volumetric-planning and functional indicators. Built-up area: 297.00 m2 Total built-up area without basement: 2970.00 m2 Total built-up area with basement: 3267.00 m2 Number of floors: 10 above ground, semi-underground - 1; underground - 0.