Renewable Energy Sources in the Municipality of Kornowac | Tenderlake

Renewable Energy Sources in the Municipality of Kornowac

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
05 June 2026
Closing Date:
06 July 2026
Location(s):
PL227 Rybnicki (PL Poland/POLSKA)
Description:
The project involves preparing documentation and implementing renewable energy systems, including photovoltaic systems, heat pumps, and energy storage in public buildings in the Municipality of Kornowac, with opportunities for partial bids across three defined parts.

1. The subject of the contract is the preparation of project documentation and comprehensive implementation of the investment task titled "Renewable Energy Sources in the Municipality of Kornowac." The task involves designing and executing the supply, installation, and commissioning of systems: photovoltaic systems, heat pumps, and energy storage in public utility buildings within the Municipality of Kornowac.
2. The contracting authority, in accordance with Article 91(1) of the Public Procurement Law, allows for submitting partial bids divided into 3 parts as outlined below:
1) Part 1 of the contract – "Renewable Energy Sources in the Municipalities of Gorzyce, Godów, Kornowac, and Radlin," the subject of which includes the installation of renewable energy sources, divided into buildings:
a. Building of the Municipal Office in Kornowac:
- Installation of photovoltaic systems in the form of photovoltaic canopies,
- Reconstruction of the heating system of the existing gas boiler room – installation of air-to-water heat pumps,
b. Building of the Primary School in Kornowac:
- Installation of photovoltaic systems
c. Building of the Cultural Center in Rzuchów:
- Expansion of the existing photovoltaic system
d. Building of the Cultural Center in Pogrzebień:
- Expansion of the existing photovoltaic system in the form of photovoltaic canopies,
e. Building of the Cultural Center in Kobyla:
- Expansion of the existing photovoltaic system
f. Building of the Public Kindergarten in Pogrzebień:
- Installation of photovoltaic systems,
- Installation of energy storage
- Reconstruction of the heating system of the existing gas boiler room – installation of air-to-water heat pumps.
2) Part 2 of the contract – "Renewable Energy Sources in the Municipality of Kornowac (LGD)," whose subject includes the installation of renewable energy sources, divided into buildings:
g. Building of the Culture and Library Center in Kornowac:
- Expansion of the existing photovoltaic system in the form of photovoltaic canopies,
- Installation of energy storage,
- Reconstruction of the heating system of the existing gas boiler room – installation of air-to-water heat pumps,
h. Building of the former Agricultural Circle in Kornowac:
- Installation of photovoltaic systems.
3) Part 3 of the contract – "Comprehensive actions to improve the energy efficiency of public utility buildings in the Municipality of Kornowac – Thermomodernization of the Educational and Kindergarten Complex in Kobyla," the subject of which includes carrying out thermomodernization primarily involving the installation of:
- air-to-water heat pumps;
- thermal energy management system in the building's heating installation;
- photovoltaic panels.
3. The detailed scope of work to be carried out by the Contractor is described in:
For part 1: - PFU, For part 2: - PFU, For part 3: - PFU, which are Attachments No. 1 to the SWZ and the Draft Agreement - Attachment No. 2 SWZ and are an integral part of the SWZ.


LOT-0001
PART 1
Part 1 of the contract – "Renewable Energy Sources in the Municipalities of Gorzyce, Godów, Kornowac, and Radlin."
Part 1 of the contract – "Renewable Energy Sources in the Municipalities of Gorzyce, Godów, Kornowac, and Radlin," whose subject includes the installation of renewable energy sources, divided into buildings:
a. Building of the Municipal Office in Kornowac:
- Installation of photovoltaic systems in the form of photovoltaic canopies,
- Reconstruction of the heating system of the existing gas boiler room – installation of air-to-water heat pumps,
b. Building of the Primary School in Kornowac:
- Installation of photovoltaic systems
c. Building of the Cultural Center in Rzuchów:
- Expansion of the existing photovoltaic system
d. Building of the Cultural Center in Pogrzebień:
- Expansion of the existing photovoltaic system in the form of photovoltaic canopies,
e. Building of the Cultural Center in Kobyla:
- Expansion of the existing photovoltaic system
f. Building of the Public Kindergarten in Pogrzebień:
- Installation of photovoltaic systems,
- Installation of energy storage
- Reconstruction of the heating system of the existing gas boiler room – installation of air-to-water heat pumps.


LOT-0002
PART 2
Part 2 of the contract – "Renewable Energy Sources in the Municipality of Kornowac (LGD)."
Part 2 of the contract – "Renewable Energy Sources in the Municipality of Kornowac (LGD)," whose subject includes the installation of renewable energy sources, divided into buildings:
a. Building of the Culture and Library Center in Kornowac:
- Expansion of the existing photovoltaic system in the form of photovoltaic canopies,
- Installation of energy storage,
- Reconstruction of the heating system of the existing gas boiler room – installation of air-to-water heat pumps,
b. Building of the former Agricultural Circle in Kornowac:
- Installation of photovoltaic systems.


LOT-0003
PART 3
Part 3 of the contract – "Comprehensive actions to improve the energy efficiency of public utility buildings in the Municipality of Kornowac – Thermomodernization of the Educational and Kindergarten Complex in Kobyla."
Part 3 of the contract – "Comprehensive actions to improve the energy efficiency of public utility buildings in the Municipality of Kornowac – Thermomodernization of the Educational and Kindergarten Complex in Kobyla," whose subject involves carrying out thermomodernization mainly entailing:
- air-to-water heat pumps;
- thermal energy management system in the building's heating installation;
- photovoltaic panels.

The Buyer:
Gmina Kornowac
Additional information:
Link:
Additional document: _DEFAULT_VALUE_CHANGE_ME_
Link:
View Full Notice
Link:
Download Full Notice as PDF
CPV Code(s):
09331200 - Solar photovoltaic modules
45000000 - Construction work
45100000 - Site preparation work
45110000 - Building demolition and wrecking work and earthmoving work
45200000 - Works for complete or part construction and civil engineering work
45223100 - Assembly of metal structures
45223200 - Structural works
45223500 - Reinforced-concrete structures
45232140 - District-heating mains construction work
45261000 - Erection and related works of roof frames and coverings
45262000 - Special trade construction works other than roof works
45300000 - Building installation work
45311000 - Electrical wiring and fitting work
45312100 - Fire-alarm system installation work
45315100 - Electrical engineering installation works
45315300 - Electricity supply installations
45317300 - Electrical installation work of electrical distribution apparatus
45320000 - Insulation work
45330000 - Plumbing and sanitary works
45331000 - Heating, ventilation and air-conditioning installation work
45332000 - Plumbing and drain-laying work
45340000 - Fencing, railing and safety equipment installation work
45400000 - Building completion work
45410000 - Plastering work
45440000 - Painting and glazing work
45450000 - Other building completion work
71000000 - Architectural, construction, engineering and inspection services
71200000 - Architectural and related services
71210000 - Advisory architectural services
71220000 - Architectural design services
71240000 - Architectural, engineering and planning services
71321000 - Engineering design services for mechanical and electrical installations for buildings