Framework Agreement for Environmental Monitoring of the Entire Project. 2 Lots: - Lot 1 - Biodiversity, - Lot 2 - Controls Related to Soil, Water, and Construction Nuisances | Tenderlake

Framework Agreement for Environmental Monitoring of the Entire Project. 2 Lots: - Lot 1 - Biodiversity, - Lot 2 - Controls Related to Soil, Water, and Construction Nuisances

Contract Value:
EUR 4M - 4M
Notice Type:
Contract Notice
Published Date:
26 December 2025
Closing Date:
27 February 2026
Location(s):
FR FRANCE
Description:
The ecological monitoring contract focuses on biodiversity and controls related to soil, water, and construction nuisances in the Seine-Nord Europe canal project area, with each lot assigned to a single holder.

The ecological monitoring mission of this contract covers the immediate study area of the Seine-Nord Europe canal (project area within the DUP or in the immediate vicinity) in sectors 1 to 6, along with compensation sites located outside the DUP perimeter and the monitoring of the environmental observatory. Each lot is awarded to a single Holder.


LOT-0001
1
Biodiversity.
Adoption of the measures prescribed in the prefectural orders, raising awareness of the applicable avoidance and reduction measures, support for companies during construction, conducting ecological diagnostics on buildings, and other missions.


LOT-0002
2
Controls related to soil, water, and construction nuisances.
Adoption of the measures prescribed in the prefectural orders, technical assistance in case of construction incidents, provision of a specialist, and other missions.

The Buyer:
Société du Canal Seine-Nord Europe
Additional information:
Link:
Additional document: 1759085
Link:
View Full Notice
Link:
Download Full Notice as PDF
CPV Code(s):
90710000 - Environmental management
90711000 - Environmental impact assessment other than for construction
90713000 - Environmental issues consultancy services
90714000 - Environmental auditing