Preparation of Design Documentation and Execution of Construction Works for the "Energy" Subsystem - Overhead Contact System on Railway Line No. 85 Section Warsaw - Łódź | Tenderlake

Preparation of Design Documentation and Execution of Construction Works for the "Energy" Subsystem - Overhead Contact System on Railway Line No. 85 Section Warsaw - Łódź

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
09 September 2026
Closing Date:
29 September 2026
Location(s):
PL913 Warszawski zachodni (PL Poland/POLSKA)
Description:
Preparation of design documentation and construction works for an overhead contact system on the railway line, including power supply elements and necessary infrastructure reconstruction, along with obtaining required certifications for operation.

The subject of the Contract is the preparation of Design Documentation and execution of construction works aimed at building an overhead contact system, including power supply elements, autotransformer cabins, and control of KDP overhead contact system switches on the section Kotowice – CPK Railway Junction – Łódź, as well as on connecting sections to the existing/under-construction state by PKP PLK along with reconstruction of the existing PKP PLK infrastructure at connection points to the extent necessary. Furthermore, the Contractor is obliged to obtain the EU verification certificate for the Energy subsystem, issue appropriate verification declarations, and prepare all necessary documentation required to obtain permission for the indefinite exploitation of the Energy subsystem. The operational and design speed of the line is 350 km/h.


LOT-0001
FZA.2510.57.2025/MG/84
Preparation of design documentation and execution of construction works for the "Energy" subsystem - overhead contact system on railway line no. 85 section Warsaw - Łódź.
The subject of the Contract is the preparation of Design Documentation and execution of construction works aimed at building an overhead contact system, including power supply elements, autotransformer cabins, and control of KDP overhead contact system switches on the section Kotowice – CPK Railway Junction – Łódź, as well as on connecting sections to the existing/under-construction state by PKP PLK along with reconstruction of the existing PKP PLK infrastructure at connection points to the extent necessary. Furthermore, the Contractor is obliged to obtain the EU verification certificate for the Energy subsystem, issue appropriate verification declarations, and prepare all necessary documentation required to obtain permission for the indefinite exploitation of the Energy subsystem. The operational and design speed of the line is 350 km/h. Detailed subject of the contract is described in the Description of Needs and Requirements (OPW).

The Buyer:
Centralny Port Komunikacyjny sp. z o.o.
Additional information:
Link:
Download Full Notice as PDF
Link:
View Full Notice
Link:
Additional document: FZA.2510.57.2025/MG/84
CPV Code(s):
34632300 - Electrical installations for railways
45000000 - Construction work
45231400 - Construction work for electricity power lines
45232220 - Substation construction work
45234100 - Railway construction works
71321000 - Engineering design services for mechanical and electrical installations for buildings
71322000 - Engineering design services for the construction of civil engineering works