"Construction of Energy Storage Systems in the Zabrodzie Municipality Area". | Tenderlake

"Construction of Energy Storage Systems in the Zabrodzie Municipality Area".

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
15 September 2026
Closing Date:
22 September 2026
Location(s):
PL924 Ostrołęcki (PL Poland/POLSKA)
Description:
Design and installation of energy storage systems for photovoltaic installations in 50 residential houses and 4 public utility buildings in the Zabrodzie Municipality to meet their energy needs.

The subject of the contract is the design and subsequent delivery with installation of energy storage systems for existing photovoltaic installations in 50 residential houses and 4 public utility buildings within the Zabrodzie Municipality area in accordance with the Functional-Operational Program constituting the Description of the Subject of the Contract as Annex No. 1a to the Terms of Reference (ToR) concerning residential houses along with Annex No. 1c to the ToR concerning the types of installations for residential buildings, and in accordance with the Functional-Operational Program constituting the Description of the Subject of the Contract as Annex No. 1b to the ToR concerning public utility buildings.
The aforementioned installations will be installed to meet the energy needs of public utility buildings and residential houses in the Zabrodzie Municipality.
For the execution of the contract, the Contractor will use brand-new electric energy storage units that meet the requirements specified in the table in point 6.1.2.2 of the Functional-Operational Program (FOP), ensuring the possibility of implementing a dedicated IT system, described below in point 11.
The list of buildings in which the installation of electric energy storage units is to be carried out has been included in the Table on page 2 of the Functional-Operational Program (hereinafter referred to as “FOP”) for public utility buildings, which constitutes Annex No. 1a to the ToR, and in Annex No. 1 to the FOP regarding residential houses.

Energy storage installations in public utility buildings will have the following capacities:
a) not less than 5 kWh (1 unit),
b) not less than 7 kWh (2 units),
c) not less than 10 kWh (1 unit)

Energy storage installations in single-family houses will have the following capacities:
a) not less than 6 kWh (25 units),
b) not less than 10 kWh (25 units).
The indicated capacity of the electric energy storage units is adjusted to the electricity production of the existing renewable energy sources (RES) devices.


LOT-0001
RG.271.4.2026
Construction of energy storage systems in the Zabrodzie Municipality area.
The subject of the contract is the design and subsequent delivery with installation of energy storage systems for existing photovoltaic installations in 50 residential houses and 4 public utility buildings within the Zabrodzie Municipality area in accordance with the Functional-Operational Program constituting the Description of the Subject of the Contract as Annex No. 1a to the Terms of Reference (ToR) concerning residential houses along with Annex No. 1c to the ToR concerning the types of installations for residential buildings, and in accordance with the Functional-Operational Program constituting the Description of the Subject of the Contract as Annex No. 1b to the ToR concerning public utility buildings.
The aforementioned installations will be installed to meet the energy needs of public utility buildings and residential houses in the Zabrodzie Municipality.
For the execution of the contract, the Contractor will use brand-new electric energy storage units that meet the requirements specified in the table in point 6.1.2.2 of the Functional-Operational Program (FOP), ensuring the possibility of implementing a dedicated IT system, described below in point 11.
The list of buildings in which the installation of electric energy storage units is to be carried out has been included in the Table on page 2 of the Functional-Operational Program (hereinafter referred to as “FOP”) for public utility buildings, which constitutes Annex No. 1a to the ToR, and in Annex No. 1 to the FOP regarding residential houses.
Energy storage installations in public utility buildings will have the following capacities:
a) not less than 5 kWh (1 unit),
b) not less than 7 kWh (2 units),
c) not less than 10 kWh (1 unit)

Energy storage installations in single-family houses will have the following capacities:
a) not less than 6 kWh (25 units),
b) not less than 10 kWh (25 units).
The indicated capacity of the electric energy storage units is adjusted to the electricity production of the existing renewable energy sources (RES) devices.

The Buyer:
Gmina Zabrodzie
Additional information:
Link:
Additional document: generated_id
Link:
View Full Notice
Link:
Download Full Notice as PDF
CPV Code(s):
31000000 - Electrical machinery, apparatus, equipment and consumables; lighting
31400000 - Accumulators, primary cells and primary batteries
31422000 - Battery packs
31430000 - Electric accumulators
31440000 - Batteries
31680000 - Electrical supplies and accessories
31700000 - Electronic, electromechanical and electrotechnical supplies