Supply, design, approval of equipment and accessories, installation, integration with the Beneficiary’s existing systems, execution of works, testing, commissioning, staff training, and warranty provision for the charging infrastructure related to project no. C10-I14-189 - "DEVELOPMENT/UPDATE IN GIS FORMAT OF TERRITORY DEVELOPMENT AND URBAN PLANNING DOCUMENTS – GENERAL URBAN PLAN, IN BRAȘOV MUNICIPALITY AND ENSURING INFRASTRUCTURE FOR GREEN TRANSPORT – ELECTRIC VEHICLE CHARGING POINTS" – for 45 electric vehicle charging stations.
The general objective of the project is the development of public infrastructure for electric vehicle energy supply and, implicitly, the improvement of environmental quality by reducing greenhouse gas emissions and encouraging the use of electric and/or plug-in hybrid vehicles.
The specific objectives of the project are as follows:
a) Development of electric vehicle energy supply infrastructure by:
• installing electric vehicle charging stations in public spaces, accessible to the general public;
• ensuring simultaneous charging of at least 2 vehicles per station;
• ensuring, where applicable, an installed power of 22 kW/port for AC stations and fast charging points of 100 kW for DC stations, according to the project's technical requirements;
• integrating the stations into a monitoring and reporting system.
b) Increasing the visibility and accessibility of the charging infrastructure by:
• installing information panels in areas with major impact (along main road arteries), as well as registering the charging stations in the main mobile applications used by drivers (Waze, Google Maps, PlugShare, etc.);
• registering the stations in common driver localization and navigation applications and platforms (e.g., Waze, Google Maps, PlugShare, etc.).
c) Improving environmental quality by encouraging the use of electric vehicles through:
• identifying and using suitable locations for station installation;
• dimensioning the network so that it serves both residents and users who commute daily within the municipality;
• ensuring connection and reporting to a central management system.
The number of days during which any interested economic operator has the right to request clarifications or additional information regarding the awarding documentation is 20 days before the deadline for submission of tenders.
The contracting authority will respond clearly and fully to all clarification requests on the 10th day before the deadline for submission of tenders.
LOT-0000
Default lot.
Supply, design, approval, installation, integration with existing systems for the charging infrastructure related to project no. C10-I14-189 - 45 electric vehicle charging stations