"Modernization of the water supply network on Tuwima Street, Kniaźnina Street, Czecha Street, Lokajskiego Street, and Kusocińskiego Street in Puławy"
Contract Value:
-
Notice Type:
Contract Notice
Published Date:
22 October 2026
Closing Date:
06 November 2026
Location(s):
PL81 Lubelskie (PL Poland/POLSKA)
Description:
The project involves modernizing the water supply network on multiple streets in Puławy, utilizing the static cracking method and PE pipes, while ensuring continuity of water supply and compliance with safety regulations.
"Modernization of the water supply network on Tuwima Street and Kniaźnina Street The subject of the contract is the modernization of the existing water supply network on Tuwima Street and Kniaźnina Street in Puławy, using the static cracking method, without changing the network location. The new water supply network should be made from PE pipes. The construction works will be carried out as part of task no. 1 entitled: "Replacement of distribution water networks made of asbestos-cement and pipelines with an operational period exceeding 50 years" covered by the project: "Improvement of water supply safety and quality in Puławy," implemented under the European Funds for Infrastructure, Climate, Environment 2021–2027 program (FEnIKS). Works will be carried out based on: - notification dated 08.01.2024 concerning the reconstruction of the water supply network on plot no. 544/4 at Lokajskiego Street, plot no. 544/6 at Czecha Street, on plots no. 3241/1, 543/1 at Kusocińskiego Street, and on plots no. 546, 559/3 at Bema Street in Puławy, case reference AB.6743.9.6.2023.MS, - notification dated 13.12.2023 regarding the reconstruction of the water supply network on plots no. 865/2, 981, 1112, 1144 located at Tuwima Street and Kniaźnina Street in Puławy, to which the Puławy Starost did not raise objections. Within the scope of the order concerning the reconstruction of the water supply network on Tuwima Street and Kniaźnina Street, the following should be done: - Perform cracking of the existing DN100 water supply network, probably made of asbestos-cement pipes, on Tuwima Street and Kniaźnina Street in Puławy, with a total length of approx. 344.35 m, on the section from the intersection of Chmielowskiego Street and Tuwima Street to the intersection of Kniaźnina Street and Sienkiewicza Street – detailed location of the water supply to be reconstructed is specified in the project documentation. For the network modernization, PE 100 RC SDR11 pipes, two-layer with a protective PP jacket, with a diameter of DN160 mm, should be used. - Sections of connections indicated in the project documentation in the road belt on the existing route are subject to reconstruction only in the scope of reconnection to the new pipeline; replacement of connections from the network to property boundaries should not be calculated, only the reconnections to the new pipeline. If it is necessary to make a "splice" of the pipeline on the connections to connect them to the modernized network, a PE100 RC SDR11 pipe with an inner diameter not smaller than the inner diameter of the existing connection pipe should be used for this purpose. In the event of discrepancies between the parameters of existing connections assumed in the project documentation in terms of their diameter and their actual dimensions (diameter), causing the need to use different assembly materials to make the connection to the new network than those provided in the project documentation, the Contractor shall agree with the Contracting Authority on an alternative method of making the connection and the parameters of the assembly materials. - Installation of fittings, including hydrants, valves, couplings, fittings, etc. Regarding the scope of the order for the reconstruction of the water supply network on Czecha Street, Lokajskiego Street, Bema Street, and Kusocińskiego Street, the following shall be done: - Perform cracking of existing sections of DN100 water supply networks, likely made of asbestos-cement pipes, on Czecha Street, Lokajskiego Street, Bema Street, and Kusocińskiego Street in Puławy, with a total length of approx. 481.85 m, from the intersection of Kusocińskiego Street and Czecha Street to the end of Lokajskiego Street, and from Bema Street to the boundary between plots no. 543/3 and 543/1 (the water supply across plots no. 544/3, 542/1, and 543/3 is not subject to reconstruction due to lack of consent to carry out construction works on the above plots) – detailed location of the water supply to be reconstructed is specified in the project documentation. For the network modernization, PE 100 RC SDR11 pipes, two-layer with a protective PP jacket, with a diameter of DN160 mm, shall be used. - Sections of connections indicated in the project documentation in the road belt on the existing route are subject to reconstruction only in the scope of reconnection to the new pipeline; replacement of connections from the network to property boundaries should not be calculated, only the reconnections to the new pipeline. If it is necessary to make a "splice" of the pipeline on the connections to connect them to the modernized network, a PE100 RC SDR11 pipe with an inner diameter not smaller than the inner diameter of the existing connection pipe should be used for this purpose. The subject of the order includes the reconstruction of one connection on a new route – this concerns the connection between nodes W34-W34a with a length of approx. 3.5 m. In the event of discrepancies between the parameters of existing connections assumed in the project documentation in terms of their diameter and their actual dimensions (diameter), causing the need to use different assembly materials to make the connection to the new network than those provided in the project documentation, the Contractor shall agree with the Contracting Authority on an alternative method of making the connection and the parameters of the assembly materials. - Decommissioning a pipeline section of approx. 42 m and construction of a new section of the water supply connection (between nodes W34-W34a of about 3.5 m length). - Installation of fittings, including hydrants, valves, couplings, fittings, etc. The Contracting Authority does not have knowledge regarding the presence of asbestos-cement along the entire route of the network planned for modernization; it may be possible that other materials and diameters of the existing network occur than assumed. Therefore, the Contractor should provide tools allowing the modernization of the water supply from various materials and different diameters. The occurrence of a different material and diameter of the existing water supply (network, connections) planned for modernization than assumed in the project documentation does not constitute grounds for the Contractor to claim an increase in the basic – offered remuneration. The area where construction works are expected to be performed consists of road belts of municipal roads managed by the Municipal Roads Authority in Puławy. The Contracting Authority is not the owner of the land where the works will be carried out but holds the right to dispose of the property for construction purposes; however, the obligation to obtain decisions/consents permitting works on the territory of respective properties for access to carry out works rests with the Contractor. The Contractor is also obliged to implement the provisions of decisions/consents for occupying the land for construction works, such as preparing a traffic organization plan for the construction period and implementing and maintaining temporary traffic organization. The Contractor is obliged to construct and maintain bypasses for existing connections at their own cost. Bypasses should ensure continuity of water supply during the works in the required quantity and at a minimum pressure of 0.2 MPa for all receivers supplied from the modernized network. The bypass should be constructed with one-sided supply. Before connecting the bypass to the network, the Contractor shall provide the Contracting Authority with positive test results for the bypass, including at least the free chlorine content and indicators: Escherichia coli, coliform bacteria, and enterococci. The Contractor, in agreement with the Contracting Authority, will prepare a place for installing a water meter at the bypass supply from the water supply network. Costs of water consumed by customers connected to the bypass shall not be charged to the Contractor and will be settled based on the readings of water meters installed in the properties. Costs of water for flushing, disinfecting the bypass and the new water supply network, as well as for other technological needs and leaks (water losses), shall be borne by the Contractor. Costs charged to the Contractor will be determined based on the difference between the reading of the water meter installed on the bypass supply and the total water consumed by service recipients supplied via the bypass, calculated from the readings of water meters installed on the properties. If it is necessary to make a "splice" of the pipeline on the connection to perform the connection to the modernized network, a PE100 RC SDR11 pipe with an inner diameter not smaller than the inner diameter of the existing connection pipe shall be used for this purpose. In the case of discrepancies between the parameters of existing connections assumed in the project documentation regarding their diameter and their actual dimensions (diameter), causing the need to use different assembly materials to make the connection to the new network than those provided in the project documentation, the Contractor, in agreement with the Contracting Authority, shall agree on an alternative method of connection and the parameters (including diameter) of assembly materials. Dismantled fittings should be deposited at a location indicated by the Contracting Authority – at the water station on Skowieszyńska Street 51. If there are technical difficulties in performing the works according to the project documentation, a change in the technology for carrying out the works is allowed after obtaining the Contracting Authority's consent. Potential reconnection of unregistered connections discovered during the works and not included in the project documentation will be treated as additional works and commissioned according to contractual provisions regulating additional work execution. If the Contractor or Contracting Authority finds that the pipes indicated in the project documentation as pipelines for reconnection are missing on site, such works will primarily be considered replacement works for reconnection of unregistered connections not included in the project documentation, and if it is impossible to classify them as replacement works, they will be classified as abandoned works. Detailed description of the subject of the contract in SWZ III. Description of the subject of the contract. Category: Construction works / Construction works CPV: 45232000-2 Auxiliary works related to pipelines and cables, 45262600-7 Various special construction works, 45332000-3 Water and sewer installation works, 45453000-7 Renovation and repair works Place of implementation: Puławy, Puławy County, Lublin Voivodeship Warranty period: The Contractor grants the Contracting Authority a 5-year warranty for the entire subject of the contract. Evaluation criteria: - Price criterion only. Price+100%=100 points Details in chapter XVI. DESCRIPTION OF OFFER EVALUATION CRITERIA WITH THE WEIGHTS OF THESE CRITERIA AND THE METHOD OF OFFER EVALUATION
Conditions for participation: - Knowledge and experience: The Contracting Authority will consider the condition met if the Contractor demonstrates that in the last 10 years before the deadline for submitting offers, or if the business period is shorter – during this period, at least one construction work was performed involving: - execution of reconstruction/modernization of a water supply network at least 200 m long with a minimum diameter of DN100, using the cracking method with PE pipes, with a minimum outer diameter of DN125, - execution of a bypass and its maintenance during works on the modernized water supply. - Persons capable of executing the contract: Site manager with required professional qualifications to perform independent technical functions in construction – to manage construction works without restrictions in the installation specialty in the scope of networks, installations, and heating, ventilation, gas, water and sewage devices or qualifications issued under previously applicable law to perform independent technical functions in construction – to manage construction works without restrictions in the installation specialty in the scope of water supply networks, installations, and devices."