The Framework Agreement for Electrical and Process Automation Work iWA2.0/iPA2.0 2026-2030 is primarily based on the programs iWA2.0 and iPA2.0. The non-exhaustive tasks are divided into:
• Work on the objects such as weirs and pumping stations, weed screens, measuring points, and similar objects in the water system. These objects belong to the iWA2.0 program.
• Work on sewage pumping stations and wastewater treatment plants (rwzi's) in the water chain. These objects belong to the iPA2.0 program;
• Outside the iWA2.0 and iPA2.0 programs, work at the (de)central locations/offices of WSRL may be part of this Framework Agreement. The work must be related to the tasks as mentioned in this Procurement Guidance;
• Secondment of personnel in case of capacity needs at WSRL.
For these objects, primarily electrical installation work needs to be carried out. Usually, the engineering tasks are performed by WSRL itself. In some cases, the engineering may be part of the Additional Assignment by the Contractor.
WSRL pursues the following objectives for the entire iWA2.0 and iPA2.0 programs:
• Replacing the process automation once every 12.5 years of the objects where only electrical and process automation replacement should take place;
• When replacing process automation, simultaneously replacing the electrical components that no longer meet the standards or are due for replacement, including the required documentation of the objects;
• Keeping the technical and functional aspects in order for the central main posts of the water system and water chain.
The purpose of this tender is twofold:
1. To conclude a Framework Agreement(s) with one or more companies for Electrical Installations & Process Automation Work iWA2.0/iPA2.0 2026-2030;
2. To provide one Assignment (an Additional Assignment from field B) for work on the pumping station Middelkoop.
LOT-0000
Framework Agreement for Electrical and Process Automation Work iWA2.0/iPA2.0 2026.
The Framework Agreement for Electrical and Process Automation Work iWA2.0/iPA2.0 2026-2030 is primarily based on the programs iWA2.0 and iPA2.0. The non-exhaustive tasks are divided into:
• Work on the objects such as weirs and pumping stations, weed screens, measuring points, and similar objects in the water system. These objects belong to the iWA2.0 program.
• Work on sewage pumping stations and wastewater treatment plants (rwzi's) in the water chain. These objects belong to the iPA2.0 program;
• Outside the iWA2.0 and iPA2.0 programs, work at the (de)central locations/offices of WSRL may be part of this Framework Agreement. The work must be related to the tasks as mentioned in this Procurement Guidance;
• Secondment of personnel in case of capacity needs at WSRL.
For these objects, primarily electrical installation work needs to be carried out. Usually, the engineering tasks are performed by WSRL itself. In some cases, the engineering may be part of the Additional Assignment by the Contractor.
WSRL pursues the following objectives for the entire iWA2.0 and iPA2.0 programs:
• Replacing the process automation once every 12.5 years of the objects where only electrical and process automation replacement should take place;
• When replacing process automation, simultaneously replacing the electrical components that no longer meet the standards or are due for replacement, including the required documentation of the objects;
• Keeping the technical and functional aspects in order for the central main posts of the water system and water chain.
The purpose of this tender is twofold:
1. To conclude a Framework Agreement(s) with one or more companies for Electrical Installations & Process Automation Work iWA2.0/iPA2.0 2026-2030;
2. To provide one Assignment (an Additional Assignment from field B) for work on the pumping station Middelkoop.