The contract includes the supply and installation of a Shore Power Facility and subsequent technical training in it. The Shore Power Facility shall supply container ships with shore power from a container solution containing OPS. The bidder shall connect OPS to the supply cable drawn from the TreFor transformer station. The supply cable is of the type: 3x1x185/35 mm2 X-VOLT®Nordic/TSLF CU 6/10 (12) kV. From OPS, the bidder shall pull cables out to 2 connection points at Dock 18 and Dock 19, where 2 plugs shall be made at each connection point, from where power is supplied to the ships. The bidder shall supply and pull the cables through the pull pipes laid out by FH as well as multiduct. At the end of the cables, the bidder shall supply and install 2 plugs (Local Connection Point LCP) at the connection point at Dock 18 and 2 plugs (Local Connection Point LCP) at the connection point at Dock 19, from where power is supplied to the ships. The bidder shall be responsible for obtaining a building permit for the Shore Power Facility as well as any other necessary administrative approvals. The delivery includes subsequent technical training in the Shore Power Facility.
LOT-0000
Tender for the Supply and Installation of Shore Power Facilities.
The contract includes the supply and installation of a Shore Power Facility and subsequent technical training in it. The Shore Power Facility shall supply container ships with shore power from a container solution containing OPS. The bidder shall connect OPS to the supply cable drawn from the TreFor transformer station. The supply cable is of the type: 3x1x185/35 mm2 X-VOLT®Nordic/TSLF CU 6/10 (12) kV. From OPS, the bidder shall pull cables out to 2 connection points at Dock 18 and Dock 19, where 2 plugs shall be made at each connection point, from where power is supplied to the ships. The bidder shall supply and pull the cables through the pull pipes laid out by FH as well as multiduct. At the end of the cables, the bidder shall supply and install 2 plugs (Local Connection Point LCP) at the connection point at Dock 18 and 2 plugs (Local Connection Point LCP) at the connection point at Dock 19, from where power is supplied to the ships. The bidder shall be responsible for obtaining a building permit for the Shore Power Facility as well as any other necessary administrative approvals. The delivery includes subsequent technical training in the Shore Power Facility.