Part 1: Development of the Event Space to achieve a more complex tourism experience Part 2: Expansion of Active Experience Offerings titled "Local and Regional Tourism Development" around Templom Hill Part 3: "Local and Regional Tourism Development" titled Active Tourism related Villány Experience Route
LOT-0001
EKR000076362026/1
Development of the Event Space.
Part 1: TOP_Plusz‐6.1.3-21 identifier number titled "Local and Regional Tourism Development" Development of the Event Space to achieve a more complex tourism experience Preparation of permit and execution-level design plans, support of public procurement procedure, design supervision, as well as cost expert tasks 1. Construction of pavement on land parcel no. 35 (possibly also affecting no. 34/6) Development tasks / disciplines involved: - Plot boundary arrangement - Geodesy - Transportation / stormwater drainage - High voltage electricity - Landscape architecture - Investigation of water supply possibilities 2. Establishment of a mobilization area on the north side of the reception building (parcel no. 34/6) Development tasks / disciplines involved: - Geodesy - Plot boundary arrangement - Transportation / stormwater drainage - Landscape architecture 3. Construction of a 40-space parking lot on parcels nos. 35, 36, 37 Development tasks / disciplines involved: - Geodesy - Plot boundary arrangement - Transportation / stormwater drainage - Landscape architecture - High voltage electricity 4. Renovation of the service road on parcel no. 34/6 Development tasks / disciplines involved: - Plot boundary arrangement - Geodesy - Transportation / stormwater drainage - High voltage electricity - Landscape architecture 5. Section I of the Ady Endre street promenade - up to the Tüzép (parcels 912/3, 914, possibly 915) Development tasks / disciplines involved: - Geodesy - Plot boundary arrangement - Transportation / stormwater drainage - High voltage electricity - Landscape architecture 6. Section II of the Ady Endre street promenade – between Tüzép and in front of the Fire Station (parcels 914, 913/2, 93/4) Development tasks / disciplines involved: - Geodesy - Plot boundary arrangement - Transportation / stormwater drainage - High voltage electricity - Landscape architecture 7. Section III of the Ady Endre street promenade – from the Fire Station to the Train Station (parcels 919/5, 919/6, 920/1, 923/4) Development tasks / disciplines involved: - Geodesy - Plot boundary arrangement - Transportation / stormwater drainage - High voltage electricity - Landscape architecture 8. Reception building of the Event Space (parcel no. 34/6) Development tasks / disciplines involved: - Master builder works - Building engineering - Electrical installation - high voltage - low voltage - if proposed by designer Design volumes: Approximately 542 m length of paved surface (promenade) will be established, with the paved area increasing by 1450 m2, and 750 m2 asphalted surface planned behind the Event Space. Additional requirements to be considered during plan preparation: The project includes planned bicycle racks, supports, parking in the immediate surroundings of the Event Space. A bicycle rest area providing charging options for mobile devices (solar-powered smart bench), free wifi service is to be designed. The exact design and location determination are part of the planning task. Support for the public procurement procedure: The winning Design Contractor (DC) is responsible as general designer to support the implementation public procurement procedure (preparation of procurement documentation annexes, answering questions arising during supplementary information, checking bids, participating in evaluation). Design supervision: The winning DC shall contract for design supervision as well. The winning DC is obliged to provide design supervision and other tasks until the end of the warranty period. Fulfillment requires availability twice a month at a time and place agreed with the Contracting Authority during the entire period of physical implementation. According to Article 19 (4) of the Public Procurement Act, the designer prepares and is responsible for the adequacy of cost estimates and cost calculations related to state construction projects, as well as for the conformity with architectural and technical documentation, and shall perform cost expert tasks defined in Article 22 of the Act.
LOT-0002
EKR000076362026/2
Expansion of Active Experience Offerings around Templom Hill.
Part 2: TOP_Plusz‐6.1.3-21 identifier number titled "Local and Regional Tourism Development" Expansion of Active Experience Offerings around Templom Hill Preparation of permit and execution-level design plans, support of public procurement procedure, design supervision, as well as cost expert tasks 1. Promenade along Ady Endre avenue from main building of Train Station to 10-space parking lot (parcels 923/4, 922/1, 921/1) Development tasks / disciplines involved: - Geodesy - Plot boundary arrangement - Transportation / stormwater drainage - High voltage electricity - Landscape architecture 2. 10-space parking lot (parcel 923/4) Development tasks / disciplines involved: - Geodesy - Plot boundary arrangement - Transportation / stormwater drainage - High voltage electricity - Landscape architecture 3. Crossing of Ady Endre avenue and road no. 5707 Villány-Újpetre (parcel 921/1) Development tasks / disciplines involved: - Geodesy - High voltage electricity - Transportation / stormwater drainage 4. Section I of Kőbánya street (parcel 859) Development tasks / disciplines involved: - Geodesy - Plot boundary arrangement - Transportation / stormwater drainage - High voltage electricity 5. Section II of Kőbánya street (parcel 859) Development tasks / disciplines involved: - Geodesy - Plot boundary arrangement - Transportation / stormwater drainage - High voltage electricity 6. Intersection of Arany János street and Dombay János street (parcel 896) Development tasks / disciplines involved: - Geodesy - Transportation / stormwater drainage - High voltage electricity 7. Pedestrian promenade on Templom Hill (parcels 872, 871/3) Development tasks / disciplines involved: - Geodesy - Transportation / stormwater drainage - High voltage electricity - Landscape architecture 8. Lookout on Templom Hill (parcels 871/4, 871/3, 871/7) Development tasks / disciplines involved: - Geodesy - Transportation / stormwater drainage - High voltage electricity - Landscape architecture Design volumes: Approximately 461.5 m pedestrian promenade planned, about 750 m long road. Additional requirements to be considered during plan preparation: The designer's tasks also include cost expert duties according to regulations for state construction projects. The project plans a 0.75 km long bicycle path from the connection at Kőbánya street to the summit of Templom Hill. The designer must also design a rain shelter, a bicycle rest area, digital options (solar-powered smart bench, free wifi). Exact design and location are part of the planning task. The bicycle rest area must include an e-bike charger, bicycle rack, bicycle stand, and basic service unit set (tools for brake, gear, tire repair kit, pump). These detailed specifications and locations are part of the planning task. The bicycle path must also be indicated in the bicycle route network plan. All plans must be reviewed by the Planning Jury operated by the Ministry of Innovation and Technology's Department of Public Roads before licensing. The bicycle path must be recorded in KENYI. Support for public procurement procedure: The winning DC is responsible as general designer for the construction procurement process (preparing procurement documentation annexes, answering questions during supplementary information, checking bids, participating in evaluation). Design supervision: The winning DC contracts for design supervision as well. The winning DC must provide design supervision and other tasks until the warranty period ends. Fulfillment requires availability twice a month at an agreed place and time with the Contracting Authority during the entire implementation period. According to Article 19 (4) of the Public Procurement Act, the designer is responsible for the adequacy of cost estimates and calculations related to state construction projects, and conformity with architectural and technical documentation, as well as performing the cost expert tasks defined in Article 22 of the Act.
LOT-0003
EKR000076362026/3
Villány Experience Route.
Part 3: TOP_Plusz‐6.1.3-21 identifier number titled "Local and Regional Tourism Development" Active tourism related Villány Experience Route Preparation of permit and execution-level design plans, support of public procurement procedure, design supervision, as well as cost expert tasks 1. Environment arrangement of the "Dormition of the Mother of God" Serbian Church (parcel no. 12/1) and Móra Ferenc street (parcel 11) Development tasks / disciplines involved: Geodesy - Transportation / stormwater drainage - High voltage electricity - Landscape architecture 2. Environment arrangement of Deák Ferenc street (parcel 768) and Municipality courtyard (parcel 1/1) Development tasks / disciplines involved: - Geodesy - Transportation / stormwater drainage - High voltage electricity - Landscape architecture 3. Environment arrangement of Kisköz street (parcel 741) Development tasks / disciplines involved: - Geodesy - Transportation / stormwater drainage - High voltage electricity - Landscape architecture 4. Environment arrangement of the public area surrounding the Health Center (parcels 729, 434/3, 730, 731, 655/1, 655/2) Development tasks / disciplines involved: - Geodesy - Plot boundary arrangement - Transportation / stormwater drainage - High voltage electricity - Low voltage electricity - Landscape architecture - Water supply / drainage for water attraction 5. Environment arrangement of Vörösmarty Mihály street and parking creation (parcels 179/4, 179/61, 179/3, 178, 177/2, 172) Development tasks / disciplines involved: - Geodesy - Plot boundary arrangement - Transportation / stormwater drainage - High voltage electricity - Low voltage electricity - Landscape architecture Design volumes: Renovation of Kisköz approx. 184 m length planned, 35 + 270 m sidewalk renovation planned, plus parking lots, the largest with 100 spaces. Additional requirements to be considered during plan preparation: The project also plans bicycle racks, supports, parking, bicycle rest area, digital bicycle tourism services, such as charging options for mobile devices – solar-powered smart bench, free wifi. Exact design and locations are part of the planning task. At the bicycle rest area, an e-bike charger must be designed with bicycle rack, stand, and basic service package tools (for brake, gear, tire repair kit, pump). These details and locations are part of the planning task. The cycling network plan must also include this bicycle path. Support for public procurement procedure: The winning DC is responsible as general designer for the construction procurement (preparation of procurement documentation annexes, answering questions during supplementary information, checking bids, participation in evaluation). Design supervision: The winning DC signs a contract for design supervision as well. The winning DC must provide design supervision and other tasks until the end of the warranty period. Fulfillment requires availability twice a month at a time and location agreed with the Contracting Authority during the entire implementation. According to Article 19 (4) of the Public Procurement Act, the designer prepares and is responsible for the adequacy of cost estimates and calculations related to state construction projects, compliance with architectural and technical documentation, and performs cost expert tasks defined in Article 22 of the Act.