Delivery and installation along with the design and commissioning of 2 photovoltaic installations and 6 photovoltaic installations with energy storage in the framework of the project: Development of decentralized energy based on renewable energy sources for public utility buildings in the Municipality of Zawiercie | Tenderlake

Delivery and installation along with the design and commissioning of 2 photovoltaic installations and 6 photovoltaic installations with energy storage in the framework of the project: Development of decentralized energy based on renewable energy sources for public utility buildings in the Municipality of Zawiercie

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
02 January 2026
Closing Date:
09 February 2026
Location(s):
PL22B Sosnowiecki (PL Poland/POLSKA)
Description:
Delivery, installation, design, and commissioning of 2 photovoltaic systems and 6 photovoltaic systems with energy storage for public utility buildings in the Municipality of Zawiercie.

I. The subject of the contract is the delivery and installation along with the design and commissioning of 2 photovoltaic installations and 6 photovoltaic installations with energy storage as part of the funding applications titled:
a) Development of decentralized energy based on renewable energy sources for public utility buildings in the Municipality of Zawiercie
b) Development of decentralized energy based on renewable energy sources for public utility buildings in the Municipality of Zawiercie 2
c) Development of decentralized energy based on renewable energy sources for public utility buildings in the Municipality of Zawiercie 3.
2. The subject of the contract includes the preparation of design documentation for 2 photovoltaic installations and 6 photovoltaic installations with energy storage for public utility buildings in the Municipality of Zawiercie, delivery of installation components, and conducting on-site installation along with accompanying infrastructure and connection to the internal power installation based on the prepared design documentation, along with commissioning of the installation and instruction.
3. The scope of work includes:
a. inventory of the electrical installation to the extent necessary for the design,
b. obtaining necessary agreements, decisions, including: applying for connection conditions for the purpose of connecting the generating source, construction permits,
c. development of design documentation and its agreement with the Ordering Party,
d. modernization and equipping the main distribution board of the building
e. construction of photovoltaic installations/storage facilities on roofs and ground with a total power of at least 297.12 kWp in the following quantities and locations:
Lp. Location Address of installation Minimum power of the photovoltaic installation Planned place of installation of the photovoltaic installation Nominal minimum capacity of the energy storage Planned place of installation of energy storage 1. OSP in Skarżyce 42-400 Zawiercie ul. Skarżycka 4
Minimum power of the photovoltaic installation 2.40 kWp, planned place of installation Roof, Nominal minimum capacity of the energy storage Not applicable Planned place of installation of energy storage Not applicable
2. Pałacyk nad Wartą 42-400 Zawiercie Ul. Filaretów 1
Minimum power of the photovoltaic installation 6.24 kWp planned place of installation Roof Nominal minimum capacity of the energy storage Not applicable Planned place of installation of energy storage Not applicable
3. City Hall in Zawiercie 42-400 Zawiercie ul. Leśna 2
Minimum power of the photovoltaic installation 99.84 kWp* planned place of installation Roof Nominal minimum capacity of the energy storage 300 kWh Planned place of installation of energy storage External energy storage
4. Primary School No. 3 in Zawiercie 42-400 Zawiercie ul. M. Skłodowskiej-Curie 16
Minimum power of the photovoltaic installation 41.28 kWp planned place of installation Roof Nominal minimum capacity of the energy storage 80 kWh Planned place of installation of energy storage In the building
5. Primary School No. 6 in Zawiercie 42-400 Zawiercie ul. Wierzbowa 4
Minimum power of the photovoltaic installation 31.68 kWp planned place of installation Roof Nominal minimum capacity of the energy storage 60 kWh Planned place of installation of energy storage In the building
6. Primary School No. 7 in Zawiercie 42-400 Zawiercie ul. Oświatowa 55
Minimum power of the photovoltaic installation 55.68 kWp planned place of installation Roof Nominal minimum capacity of the energy storage 110 kWh Planned place of installation of energy storage In the building
7. Municipal Cemetery in Zawiercie 42-400 Zawiercie ul. Przyjaźni 184
Minimum power of the photovoltaic installation 17.28 kWp planned place of installation Ground Nominal minimum capacity of the energy storage 30 kWh Planned place of installation of energy storage In the building
8. ZGM in Zawiercie 42-400 Zawiercie ul. Towarowa 30
Minimum power of the photovoltaic installation 42.72 kWp planned place of installation Roof nominal minimum capacity of the energy storage 90 kWh Planned place of installation of energy storage Internal energy storage in existing technical rooms
*maximum power not exceeding 100 kW
including:
a) obtaining all administrative and legal permissions, fire protection agreements.
b) installation of supporting structures for PV modules;
c) installation of PV modules on supporting structures;
d) installation of inverter/s;
e) installation of energy storage in buildings;
f) installation of external energy storage with an integrated energy management system;
g) laying cabling on the DC and AC side using appropriate equipment;
h) connecting the PV installation to the main electrical distribution board for the needs of the facility;
i) providing lightning protection for the photovoltaic installation;
j) for photovoltaic installations/energy storage mounted on the ground, erecting a fence with a technical entrance (gate, door) for current maintenance and repairs
f. making seals, post-installation repairs;
g. conducting tests to verify the correct operation of the system including the equipment;
h. system commissioning and adjustments;
i. marking the distribution board, cable junction indicating the PV installation and energy storage (if applicable);
j. electrical measurements;
k. training of the Ordering Party's user;
l. reporting the micro-installation to the energy company;
m. reporting the installation project reviewed by a fire protection expert to the relevant PSP unit and obtaining confirmation of the report;
n. development of as-built documentation.


LOT-0001
ZP.271.89.2025.AS
Delivery and installation along with the design and commissioning of 2 photovoltaic installations and 6 photovoltaic installations with energy storage in the framework of the project: Development of decentralized energy based on renewable energy sources for public utility buildings in the Municipality of Zawiercie.
I. The subject of the contract is the delivery and installation along with the design and commissioning of 2 photovoltaic installations and 6 photovoltaic installations with energy storage as part of the funding applications titled:
a) Development of decentralized energy based on renewable energy sources for public utility buildings in the Municipality of Zawiercie
b) Development of decentralized energy based on renewable energy sources for public utility buildings in the Municipality of Zawiercie 2
c) Development of decentralized energy based on renewable energy sources for public utility buildings in the Municipality of Zawiercie 3.
2. The subject of the contract includes the preparation of design documentation for 2 photovoltaic installations and 6 photovoltaic installations with energy storage for public utility buildings in the Municipality of Zawiercie, delivery of installation components, and conducting on-site installation along with accompanying infrastructure and connection to the internal power installation based on the prepared design documentation, along with commissioning of the installation and instruction.
3. The scope of work includes:
a. inventory of the electrical installation to the extent necessary for the design,
b. obtaining necessary agreements, decisions, including: applying for connection conditions for the purpose of connecting the generating source, construction permits,
c. development of design documentation and its agreement with the Ordering Party,
d. modernization and equipping the main distribution board of the building
e. construction of photovoltaic installations/storage facilities on roofs and ground with a total power of at least 297.12 kWp in the following quantities and locations:
Lp. Location Address of installation Minimum power of the photovoltaic installation Planned place of installation of the photovoltaic installation Nominal minimum capacity of the energy storage Planned place of installation of energy storage 1. OSP in Skarżyce 42-400 Zawiercie ul. Skarżycka 4
Minimum power of the photovoltaic installation 2.40 kWp, planned place of installation Roof, Nominal minimum capacity of the energy storage Not applicable Planned place of installation of energy storage Not applicable
2. Pałacyk nad Wartą 42-400 Zawiercie Ul. Filaretów 1
Minimum power of the photovoltaic installation 6.24 kWp planned place of installation Roof Nominal minimum capacity of the energy storage Not applicable Planned place of installation of energy storage Not applicable
3. City Hall in Zawiercie 42-400 Zawiercie ul. Leśna 2
Minimum power of the photovoltaic installation 99.84 kWp* planned place of installation Roof Nominal minimum capacity of the energy storage 300 kWh Planned place of installation of energy storage External energy storage
4. Primary School No. 3 in Zawiercie 42-400 Zawiercie ul. M. Skłodowskiej-Curie 16
Minimum power of the photovoltaic installation 41.28 kWp planned place of installation Roof Nominal minimum capacity of the energy storage 80 kWh Planned place of installation of energy storage In the building
5. Primary School No. 6 in Zawiercie 42-400 Zawiercie ul. Wierzbowa 4
Minimum power of the photovoltaic installation 31.68 kWp planned place of installation Roof Nominal minimum capacity of the energy storage 60 kWh Planned place of installation of energy storage In the building
6. Primary School No. 7 in Zawiercie 42-400 Zawiercie ul. Oświatowa 55
Minimum power of the photovoltaic installation 55.68 kWp planned place of installation Roof Nominal minimum capacity of the energy storage 110 kWh Planned place of installation of energy storage In the building
7. Municipal Cemetery in Zawiercie 42-400 Zawiercie ul. Przyjaźni 184
Minimum power of the photovoltaic installation 17.28 kWp planned place of installation Ground Nominal minimum capacity of the energy storage 30 kWh Planned place of installation of energy storage In the building
8. ZGM in Zawiercie 42-400 Zawiercie ul. Towarowa 30
Minimum power of the photovoltaic installation 42.72 kWp planned place of installation Roof nominal minimum capacity of the energy storage 90 kWh Planned place of installation of energy storage Internal energy storage in existing technical rooms
*maximum power not exceeding 100 kW
including:
a) obtaining all administrative and legal permissions, fire protection agreements.
b) installation of supporting structures for PV modules;
c) installation of PV modules on supporting structures;
d) installation of inverter/s;
e) installation of energy storage in buildings;
f) installation of external energy storage with an integrated energy management system;
g) laying cabling on the DC and AC side using appropriate equipment;
h) connecting the PV installation to the main electrical distribution board for the needs of the facility;
i) providing lightning protection for the photovoltaic installation;
j) for photovoltaic installations/energy storage mounted on the ground, erecting a fence with a technical entrance (gate, door) for current maintenance and repairs
f. making seals, post-installation repairs;
g. conducting tests to verify the correct operation of the system including the equipment;
h. system commissioning and adjustments;
i. marking the distribution board, cable junction indicating the PV installation and energy storage (if applicable);
j. electrical measurements;
k. training of the Ordering Party's user;
l. reporting the micro-installation to the energy company;
m. reporting the installation project reviewed by a fire protection expert to the relevant PSP unit and obtaining confirmation of the report;
n. development of as-built documentation.

The Buyer:
Gmina Zawiercie
Additional information:
Link:
View Full Notice
Link:
Additional document: ocds-148610-635ad789-c350-4efc-be90-114d827147cc
Link:
Download Full Notice as PDF
CPV Code(s):
09331200 - Solar photovoltaic modules
09332000 - Solar installation
31000000 - Electrical machinery, apparatus, equipment and consumables; lighting
45100000 - Site preparation work
45111300 - Dismantling works
45210000 - Building construction work
45300000 - Building installation work
45310000 - Electrical installation work
51000000 - Installation services (except software)
71200000 - Architectural and related services
71320000 - Engineering design services