Investment Activities Regarding the Construction of the Energy Cluster Energy South Infrastructure – Photovoltaic Installations, Energy Storage, and Hydrogen Installation | Tenderlake

Investment Activities Regarding the Construction of the Energy Cluster Energy South Infrastructure – Photovoltaic Installations, Energy Storage, and Hydrogen Installation

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
04 November 2026
Closing Date:
10 November 2026
Location(s):
PL217 Tarnowski (PL Poland/POLSKA)
Description:
The project involves the construction of photovoltaic installations, energy storage systems, heat pumps, and a hydrogen installation across multiple municipalities as part of the Energy Cluster Energy South Infrastructure initiative.

1. The subject of the contract is the execution of an investment task within the project entitled "Investment Activities Regarding the Construction of the Energy Cluster Energy South Infrastructure."
2. The contracting authority, pursuant to Article 91, paragraph 1 of the Act, allows submission of partial bids. The order is divided into 2 (two) parts, as described below:
2.1. Part 1 "Investment activities regarding the construction of the Energy Cluster Energy South infrastructure – photovoltaic installations, energy storage, and hot water (DHW) and central heating (CH) heat pumps in private buildings and public utility buildings"
The contract involves the design, delivery, assembly, and commissioning of:
1) for the Municipality of Gnojnik:
Residential buildings:
a) 140 photovoltaic installations with hybrid inverters and energy storage,
b) 5 photovoltaic installations with hybrid inverters without energy storage,
c) 14 energy storage installations with hybrid inverters,
d) 57 heat pump installations for central heating and domestic hot water,
Public utility buildings:
a) 14 photovoltaic installations with hybrid inverters and energy storage,
b) 4 energy storage installations with hybrid inverters,
2) for the Municipality of Borzęcin:
Residential buildings:
a) 75 photovoltaic installations with hybrid inverters and energy storage,
b) 3 photovoltaic installations with hybrid inverters without energy storage,
c) 9 energy storage installations with hybrid inverters,
Public utility buildings:
a) 12 photovoltaic installations with hybrid inverters and energy storage,
3) for the Municipality of Czchów:
Residential buildings:
a) 198 photovoltaic installations with hybrid inverters and energy storage,
b) 3 photovoltaic installations with hybrid inverters without energy storage,
c) 14 energy storage installations with hybrid inverters,
Public utility buildings:
a) 16 photovoltaic installations with hybrid inverters and energy storage,
4) for the Municipality of Dębno:
Residential buildings:
a) 93 photovoltaic installations with hybrid inverters and energy storage,
b) 4 photovoltaic installations with hybrid inverters without energy storage,
c) 14 energy storage installations with hybrid inverters,
d) 66 heat pump installations for central heating and domestic hot water,
Public utility buildings:
a) 13 photovoltaic installations with hybrid inverters and energy storage,
b) 1 photovoltaic installation with hybrid inverter without energy storage
5) for the Municipality of Iwkowa:
Residential buildings:
a) 43 heat pump installations for central heating and domestic hot water,
Public utility buildings:
a) 9 photovoltaic installations with hybrid inverters and energy storage,
b) 9 heat pump installations / cascades of heat pumps for central heating and domestic hot water,
6) for the Municipality of Szczurowa
Residential buildings:
a) 68 photovoltaic installations with hybrid inverters and energy storage,
b) 3 photovoltaic installations with hybrid inverters without energy storage,
c) 11 energy storage installations with hybrid inverters,
Public utility buildings:
a) 14 photovoltaic installations with hybrid inverters and energy storage,
b) 4 photovoltaic installations with hybrid inverters without energy storage,
c) 2 energy storage installations with hybrid inverters
A detailed scope of duties to be performed by the Contractor is described in the Project Technical Documentation (Description of the Subject of the Contract), which constitutes Annex No. 1.1 to the Terms of Reference (ToR) and in the Draft contract provisions, constituting Annex No. 2.1 to the ToR, which form an integral part of the ToR.

2.2. Part 2 – "Investment activities regarding the construction of the Energy Cluster Energy South infrastructure – hydrogen installation"
The contract involves the design, delivery, assembly, and commissioning of a hydrogen installation cooperating with the existing photovoltaic installation of the contracting authority – Municipality of Gnojnik, located at the Wastewater Treatment Plant premises in Gnojnik.
A detailed scope of duties to be performed by the Contractor is described in the Project Technical Documentation (Description of the Subject of the Contract), constituting Functional and Utility Program – Construction of RES installation on the territory of the Municipality of Gnojnik – hydrogen installation (Annex No. 1.2 to the ToR) and in the Draft contract provisions (Annex No. 2.2 to the ToR), which are an integral part of the ToR.


LOT-0001
part 1 "Investment activities regarding the construction of the Energy Cluster Energy South infrastructure – photovoltaic installations, energy storage, and hot water (DHW) and central heating (CH) heat pumps in private buildings and public utility buildings."
The contract involves the design, delivery, assembly, and commissioning of:
1) for the Municipality of Gnojnik:
Residential buildings:
a) 140 photovoltaic installations with hybrid inverters and energy storage,
b) 5 photovoltaic installations with hybrid inverters without energy storage,
c) 14 energy storage installations with hybrid inverters,
d) 57 heat pump installations for central heating and domestic hot water,
Public utility buildings:
a) 14 photovoltaic installations with hybrid inverters and energy storage,
b) 4 energy storage installations with hybrid inverters,
2) for the Municipality of Borzęcin:
Residential buildings:
a) 75 photovoltaic installations with hybrid inverters and energy storage,
b) 3 photovoltaic installations with hybrid inverters without energy storage,
c) 9 energy storage installations with hybrid inverters,
Public utility buildings:
a) 12 photovoltaic installations with hybrid inverters and energy storage,
3) for the Municipality of Czchów:
Residential buildings:
a) 198 photovoltaic installations with hybrid inverters and energy storage,
b) 3 photovoltaic installations with hybrid inverters without energy storage,
c) 14 energy storage installations with hybrid inverters,
Public utility buildings:
a) 16 photovoltaic installations with hybrid inverters and energy storage,
4) for the Municipality of Dębno:
Residential buildings:
a) 93 photovoltaic installations with hybrid inverters and energy storage,
b) 4 photovoltaic installations with hybrid inverters without energy storage,
c) 14 energy storage installations with hybrid inverters,
d) 66 heat pump installations for central heating and domestic hot water,
Public utility buildings:
a) 13 photovoltaic installations with hybrid inverters and energy storage,
b) 1 photovoltaic installation with hybrid inverter without energy storage
5) for the Municipality of Iwkowa:
Residential buildings:
a) 43 heat pump installations for central heating and domestic hot water,
Public utility buildings:
a) 9 photovoltaic installations with hybrid inverters and energy storage,
b) 9 heat pump installations / cascades of heat pumps for central heating and domestic hot water,
6) for the Municipality of Szczurowa
Residential buildings:
a) 68 photovoltaic installations with hybrid inverters and energy storage,
b) 3 photovoltaic installations with hybrid inverters without energy storage,
c) 11 energy storage installations with hybrid inverters,
Public utility buildings:
a) 14 photovoltaic installations with hybrid inverters and energy storage,
b) 4 photovoltaic installations with hybrid inverters without energy storage,
c) 2 energy storage installations with hybrid inverters
A detailed scope of duties to be performed by the Contractor is described in the Project Technical Documentation (Description of the Subject of the Contract), which constitutes Annex No. 1.1 to the ToR and in the Draft contract provisions, constituting Annex No. 2.1 to the ToR, which form an integral part of the ToR.


LOT-0002
part 2 – "Investment activities regarding the construction of the Energy Cluster Energy South infrastructure – hydrogen installation."
The contract involves the design, delivery, assembly,
and commissioning of a hydrogen installation cooperating with the existing photovoltaic installation of the contracting authority – Municipality of Gnojnik, located at the Wastewater Treatment Plant premises in Gnojnik.
A detailed scope of duties to be performed by the Contractor is described in the Project Technical Documentation (Description of the Subject of the Contract), constituting Functional and Utility Program – Construction of RES installation on the territory of the Municipality of Gnojnik – hydrogen installation (Annex No. 1.2 to the ToR) and in the Draft contract provisions (Annex No. 2.2 to the ToR), which are an integral part of the ToR.

The Buyer:
Gmina Szczurowa
Additional information:
Link:
Download Full Notice as PDF
Link:
Additional document: generated_id
Link:
View Full Notice
CPV Code(s):
09331000 - Solar panels
09331200 - Solar photovoltaic modules
09332000 - Solar installation
24111600 - Hydrogen
31158000 - Chargers
31422000 - Battery packs
31434000 - Lithium accumulators
42122180 - Fuel pumps
44611000 - Tanks
44611100 - Air cylinders
44611400 - Storage tanks
44621210 - Water boilers
45231220 - Construction work for gas pipelines
45261215 - Solar panel roof-covering work
45300000 - Building installation work
45310000 - Electrical installation work
45311200 - Electrical fitting work
45315300 - Electricity supply installations
45315600 - Low-voltage installation work
45330000 - Plumbing and sanitary works
45331000 - Heating, ventilation and air-conditioning installation work
45351000 - Mechanical engineering installation works
71320000 - Engineering design services