The subject of the contract is the delivery of a complete demonstration energy storage installation using hydrogen technology (hereinafter referred to as the “Energy Storage Installation”), including design, equipment delivery, installation, integration, commissioning, as well as necessary works and ancillary services. The requirements for the Energy Storage Installation are specified in Annex No. 4 to the TOR – Functional and Utility Program (hereinafter referred to as the “FUP").
The purpose of the Energy Storage Installation is to produce hydrogen from electricity originating exclusively from RES sources, to store it, and later convert the stored energy back into electricity, enabling demonstration and operation of the system under real conditions.
The primary location of the Energy Storage Installation is Torowa Street 12, 16-100 Sokółka, plot no. 3203/25, Sokółka precinct. The contracting authority permits changing the location of the entire hydrogen installation to another property under its control within Sokółka County and permitted by the KPO project documentation. The change must not reduce the FUP and Offer parameters, alter functions, or change the overall character of the contract.
The entire Energy Storage Installation must be integrated within a mobile containerized structure that complies with applicable transport standards.
The delivery and installation of RES sources, including photovoltaic installations, are not part of this contract. The contractor shall ensure full energy, functional, measurement, and control integration of the Energy Storage Installation with the existing or separately procured RES source. The energy used for hydrogen production, including through the BESS supporting this process, must come exclusively from RES sources. The On-grid mode does not allow the use of electricity drawn from the grid to power the electrolyzer for hydrogen production.
The purpose of the contract is to create a fully functional pilot installation, enabling practical evaluation of the hydrogen energy storage system’s operation, verification of its technical parameters, and analysis of the effectiveness of integrating hydrogen technologies with the local energy infrastructure.
The contract will be executed on a "turnkey" basis and includes all works necessary to achieve full operational readiness of the installation, including installation works, commissioning, functional testing, and handing over complete technical documentation.
LOT-0004
Design, delivery, installation, integration, and commissioning of a demonstration energy storage installation using hydrogen technology within the project entitled Development of the Energy Cluster of Municipalities of Sokółka County – Demonstration Project.
The subject of the contract is the delivery of a complete demonstration energy storage installation using hydrogen technology (hereinafter referred to as the “Energy Storage Installation”), including design, equipment delivery, installation, integration, commissioning, as well as necessary works and ancillary services. The requirements for the Energy Storage Installation are specified in Annex No. 4 to the TOR – Functional and Utility Program (hereinafter referred to as the “FUP").
The purpose of the Energy Storage Installation is to produce hydrogen from electricity originating exclusively from RES sources, to store it, and later convert the stored energy back into electricity, enabling demonstration and operation of the system under real conditions.
The primary location of the Energy Storage Installation is Torowa Street 12, 16-100 Sokółka, plot no. 3203/25, Sokółka precinct. The contracting authority permits changing the location of the entire hydrogen installation to another property under its control within Sokółka County and permitted by the KPO project documentation. The change must not reduce the FUP and Offer parameters, alter functions, or change the overall character of the contract.
The entire Energy Storage Installation must be integrated within a mobile containerized structure that complies with applicable transport standards.
The delivery and installation of RES sources, including photovoltaic installations, are not part of this contract. The contractor shall ensure full energy, functional, measurement, and control integration of the Energy Storage Installation with the existing or separately procured RES source. The energy used for hydrogen production, including through the BESS supporting this process, must come exclusively from RES sources. The On-grid mode does not allow the use of electricity drawn from the grid to power the electrolyzer for hydrogen production.
The purpose of the contract is to create a fully functional pilot installation, enabling practical evaluation of the hydrogen energy storage system’s operation, verification of its technical parameters, and analysis of the effectiveness of integrating hydrogen technologies with the local energy infrastructure.
The contract will be executed on a "turnkey" basis and includes all works necessary to achieve full operational readiness of the installation, including installation works, commissioning, functional testing, and handing over complete technical documentation.