Design of the Pécs Market Square | Tenderlake

Design of the Pécs Market Square

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
29 October 2026
Closing Date:
11 November 2026
Location(s):
HU231 Baranya (HU Hungary/MAGYARORSZÁG)
Description:
The project involves the comprehensive redesign and modernization of the Pécs Market Square to enhance infrastructure, improve aesthetic appeal, and support local economic activities while adhering to various legal and regulatory standards.

Within the framework of the "TOP_Plusz-6.2.1-23 - Sustainable Competitive Urban Development" program, the "Design program related to the function-expanding reconstruction and development of the Pécs Market Square" is to be implemented. During the design and planning process, the following laws/standards/calls must be applied: • Act C of 2023 on Hungarian Architecture • Act LXIX of 2023 on the order of state construction investments • Government Decree 190/2009 (IX. 15.) on chief architectural activities • Government Decree 191/2009 (IX.15.) on construction industry execution activities • Government Decree 237/2024 (VIII. 8.) on the designation and operating conditions of construction authorities • Government Decree 280/2024 (IX. 30.) on basic rules for zoning and construction requirements • Government Decree 281/2024 (IX. 30.) on construction authority procedures and inspections • Government Decree 283/2024 (IX. 30.) on architectural and urban planning advisory councils • Government Decree 176/2008 (VI. 30.) on certification of buildings' energy characteristics • Ministerial Decree 9/2023 (V. 25.) ÉKM on defining buildings’ energy characteristics • Ministerial Decree 54/2014 (XII. 5.) BM on the National Fire Protection Rules • "Guide to Ensuring Equal Access to Public Services – Complex Accessibility" • Municipal Decree 12/2022 (IV. 22.) on the Building Code and Regulatory Plan of Pécs City with County Rights • Municipal Decree 20/2023 (VI. 26.) on urban image protection and operation of the local architectural-technical advisory board of Pécs City with County Rights • Normative Resolution 316/2017 (XII. 14.) - Urban Image Manual of Pécs City with County Rights adopted by the Municipal Assembly • Government Decree 93/2012 (V. 10.) on the licensing of road construction, commissioning, and termination • Act I of 1988 on road traffic • Current road technical regulations (e-UME), especially e-UT 03.04.13:2019 “Design of Bicycle-Friendly Roads” - Standards e.g.: MSZ 17210, CEN/TR 17621 - "TOP_Plusz-6.2.1-23 - Sustainable Competitive Urban Development" call documentation and general guideline The successful Contractor shall perform the Designer's tasks according to Act LXIX of 2023 on state construction investments, which include preparation of permit and execution plans, as well as designer supervision during the physical implementation of the investment. It is the successful Contractor’s responsibility and task as general designer to involve all specialist subcontractors related to the development, deliver the plans within the deadline and quality required by the Client, cooperate in the construction public procurement procedure (assembling annexes of tender documents, answering questions arising during additional information process, checking bids, taking part in the evaluation), and provide designer supervision covering the construction period. • Participation in site handover/takeover procedure • Participation in two monthly on-site cooperations upon Client's request (construction period 9 months plus time provided by law for technical handover/takeover) • Preparation of overlay plans related to deviations/deficiencies from execution plans during construction • Evaluation of technical change notifications • Participation in technical handover/takeover procedure • Issuing designer’s declarations in case of occupancy permit


LOT-0001
EKR001191912026/1
Design of the Pécs Market Square.
Within the framework of the "TOP_Plusz-6.2.1-23 - Sustainable Competitive Urban Development" program, the "Design program related to the function-expanding reconstruction and development of the Pécs Market Square" The Municipality of Pécs City with County Rights is committed to the well-being of the local community and modernization of the urban infrastructure. The Pécs Market Square, which has served the local population and visitors for decades, is about to undergo a significant transformation. The current infrastructure and services of the area have become outdated. The buildings and public spaces, which have remained unchanged for decades, no longer meet today’s requirements and expectations, neither from the residents nor the traders. The central element of the development is the Market Square area and the old bus turning area south of it. Current problems of the area include minimal green space ratio, morphological disorder, technical and aesthetic obsolescence of buildings, and partial development of transport and utility networks. The aim of the project is to modernize the Market Square’s infrastructure and support the local economy while preserving traditional functions. AREAS AFFECTED BY DESIGN: • Parcel No. 24000 - “Old bus turning area of Market Square” • Parcel No. 24010 - “Market Square area” (part of the site marked on plans) • Parcel No. 23998/5 – Rátgéber Basketball Academy (optional technical content) The zoning data for parcels 24010 and 24000 with designation “K-ke-1955” mean: • detached block-type development; • minimum lot size 4000 m2; • maximum permitted coverage: 40%; • maximum building height: 12.5 m; • minimum green area ratio: 45%. The zoning data for parcel 23998/5 “K-i-1856” mean: • detached block-type development; • minimum lot size 4000 m2; • maximum permitted coverage: 40%; • maximum building height: 15.5 m; • minimum green area ratio: 40%. EXISTING BUILDINGS AFFECTED BY THE DEVELOPMENT Existing central restroom building: approx. 160 m2 net useful floor area Mázsaház building: approx. 90 m2 net useful floor area Central food court: consists of 2 building units (200 and 150 m2 net useful floor area) Pavilions along Móra Ferenc Street: after demolition of the existing pavilions indicated on the map copy, modern pavilions will be planned chosen from modules listed later. Architecture: • installation of facade thermal insulation (according to the function of the buildings) • modernization of external and internal doors and windows • modernization of walls and floors • clean painting • comprehensive accessibility improvements • review and necessary modification or expansion of existing catering units according to current laws and regulations (e.g. room relations, surface finishes, hygiene, fire and occupational safety), such as addition of dishwashing sinks, central changing rooms • expansion of covered entrance areas in front of catering units at least doubling current size. Since it is not marked on the map copy and expansion in width is difficult, it would be preferable to demolish and design a new central covered entrance area, which could function as a multifunctional space if necessary Mechanical Engineering: • modernization of rainwater drainage and collection • replacement of heating, drinking water, sewage main pipes necessary • installation of controllable electric heating (with air conditioning and/or infrared panels) • air conditioning of main rooms if necessary with associated mechanical and electrical work • replacement of sanitary fixtures, accessories and taps in wet rooms • design of wall penetrations related to tenant-installed ventilation/odor extraction systems • design of placement for consumption meters and sub-meters Electrical: • modernization of lighting (replacement of luminaires, wiring, switches/sockets) • examination of suitability and load capacity of unmetered wiring concerning network development • probable need to expand contracted electrical capacity • installation of fire alarm system if necessary • alarm system, Wi-Fi • installation of solar panel system • review and design of lightning protection system • design of placement for consumption meters and sub-meters The successful Contractor will be contracted for general designer services. Their duty and responsibility during design activity include selection of subcontractors (specialist designers) with appropriate expertise and authorizations, and conducting design activities together with the Client in accordance with the design contract. Support for public procurement procedure: The general designer’s duty and responsibility include supporting the construction public procurement process during bid evaluation. The successful Contractor participates in assembling annexes of tender documents, answering questions arising during supplementary information, checking bids, participating in evaluation, and provides designer supervision covering the physical implementation period. Designer supervision: The successful Contractor is also contracted for designer supervision. The condition of fulfillment is to be available twice a month at place and time agreed with the Contracting Authority during the entire construction period. According to Section 19 (4) of the Public Procurement Act, the designer prepares and is responsible for the substantiation of cost estimates and calculations related to state construction investments, as well as compliance with the architectural-technical documentation, and performs cost expert tasks specified in Section 22 of the Act.

The Buyer:
Pécs Megyei Jogú Város Önkormányzata
Additional information:
Link:
Download Full Notice as PDF
Link:
View Full Notice
Link:
Additional document: DOC-01
CPV Code(s):
71220000 - Architectural design services
71240000 - Architectural, engineering and planning services
71322000 - Engineering design services for the construction of civil engineering works
71334000 - Mechanical and electrical engineering services