Construction of RES installations using energy storage in public utility buildings in the Municipality of Czechowice-Dziedzice | Tenderlake

Construction of RES installations using energy storage in public utility buildings in the Municipality of Czechowice-Dziedzice

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
31 October 2025
Closing Date:
05 December 2025
Location(s):
PL225 Bielski (PL Poland/POLSKA)
Description:
Construction of renewable energy installations with energy storage and heat pumps in various public utility buildings in Czechowice-Dziedzice, including comprehensive design, installation, and commissioning services.

The subject of the contract conducted under the 'design and build' formula is: Construction of RES installations using energy storage in public utility buildings in the Municipality of Czechowice-Dziedzice, which includes comprehensive design, delivery, installation along with commissioning, as well as all construction and assembly works of complete photovoltaic installations and energy storage systems and heat pumps for the following public utility buildings of the Municipality of Czechowice-Dziedzice:
Location 1 - Public Kindergarten No. 6, ul. Szwajcarska Dolina 24; 43-502 Czechowice-Dziedzice
- Photovoltaic installation with a minimum power of 27kWp, energy storage with a usable capacity of at least 12kWh, air heat pump with a heating power of at least 40kW
Location 2 - Public Kindergarten No. 11, ul. Młyńska 6; 43-502 Czechowice-Dziedzice
- Photovoltaic installation with a minimum power of 28kWp, energy storage with a usable capacity of at least 16kWh, air heat pump with a heating power of at least 80kW
Location 3 - Public Kindergarten in Zabrzeg, ul. Tadeusza Gazdy 5; 43-516 Zabrzeg
- Photovoltaic installation with a minimum power of 25.5kWp, energy storage with a usable capacity of at least 16kWh, air heat pump with a heating power of at least 40kW
Location 4 - Primary School No. 2, ul. Węglowa 54; 43-502 Czechowice-Dziedzice
- Photovoltaic installation of the new school with a minimum power of 11.5kWp, energy storage with a usable capacity of at least 12kWh, air heat pumps with a total heating power of at least 120kW
Location 5 - Primary School No. 5, ul. Klasztorna 21; 43-502 Czechowice-Dziedzice
- Photovoltaic installation with a minimum power of 49kWp, energy storage with a usable capacity of at least 16kWh, air heat pumps with a total heating power of at least 240kW
Location 6 - Primary School No. 7, ul. Szkolna 6; 43-502 Czechowice-Dziedzice
- Photovoltaic installation with a minimum power of 45kWp, energy storage with a usable capacity of at least 16kWh, air heat pumps with a total heating power of at least 200kW
Location 7 - Primary School No. 2, ul. Miliardowicka 46; 43-518 Ligota
- Photovoltaic installation with a minimum power of 49kWp,
• for connection point PPE1: min. 24kWp
• for connection point PPE2: min. 25kWp
and energy storage with a total usable capacity of at least 24kWh
• for connection point PPE1: min. 12kWh
• for connection point PPE2: min. 12kWh,
air heat pumps with a total heating power of at least 80kW
NOTE!
The roof of the building SP No. 2 in Ligota at ul. Miliardowicka is under renovation (except for the gym with locker room facilities and the new segment). A detailed description is included in Appendix No. 10 – Functional and Utility Program (PFU), i.e. description of the roof renovation works of building SP No. 2 in Ligota – scope of planned construction works, drawing A_02 roof plan and K01 truss plan.
Location 8 - Eco and Green Center in Czechowice-Dziedzice, ul. hrabiego Kotulińskiego 2; 43-502 Czechowice-Dziedzice
- Photovoltaic installation with a minimum power of 24.5kWp including:
• existing installation 5.5kW;
• new installation with a minimum power of 19kW, and energy storage with a usable capacity of at least 12kWh

The scope of the order includes:
a) preparation of complete design documentation separately for each location along with obtaining all approvals, permits, and notifications if required by applicable law,
b) execution in accordance with the requirements and additional information described in detail by the Contracting Authority in the Functional Utility Program, construction and assembly works and supplies along with the commissioning of photovoltaic installations and heat pumps in accordance with the law regulations,
c) obtaining on behalf and for the benefit of the Contracting Authority all necessary permits and administrative decisions allowing for the use of the installation,
d) providing quality warranty for the completed installations and ensuring service and technical inspections during the warranty period.

A detailed description of the subject of the order is indicated in the Functional Utility Program (hereinafter PFU) which is an attachment No. 10 to the SWZ. Within this order, the scope of investment described in the Functional Utility Program (PFU) will be realized.
The order is co-financed from the European Union funds from the Just Transition Fund under the European Funds for Silesia Program 2021-2027, Priority FESL.10 European Funds for Transition, Action FESL.10.06 Development of distributed energy based on renewable sources.
A detailed description of the subject of the order is included in the attachments to the SWZ, i.e.:
- functional and utility program (PFU) – attachment No. 10 to SWZ;
- proposed provisions of the contract – attachment No. 11 to SWZ;
which constitute an integral part of the specification of the terms of the order.


LOT-0001
ZP.271.54.2025
Construction of RES installations using energy storage in public utility buildings in the Municipality of Czechowice-Dziedzice.
The subject of the contract conducted under the 'design and build' formula is: Construction of RES installations using energy storage in public utility buildings in the Municipality of Czechowice-Dziedzice, which includes comprehensive design, delivery, installation along with commissioning, as well as all construction and assembly works of complete photovoltaic installations and energy storage systems and heat pumps for the following public utility buildings of the Municipality of Czechowice-Dziedzice:
Location 1 - Public Kindergarten No. 6, ul. Szwajcarska Dolina 24; 43-502 Czechowice-Dziedzice
- Photovoltaic installation with a minimum power of 27kWp, energy storage with a usable capacity of at least 12kWh, air heat pump with a heating power of at least 40kW
Location 2 - Public Kindergarten No. 11, ul. Młyńska 6; 43-502 Czechowice-Dziedzice
- Photovoltaic installation with a minimum power of 28kWp, energy storage with a usable capacity of at least 16kWh, air heat pump with a heating power of at least 80kW
Location 3 - Public Kindergarten in Zabrzeg, ul. Tadeusza Gazdy 5; 43-516 Zabrzeg
- Photovoltaic installation with a minimum power of 25.5kWp, energy storage with a usable capacity of at least 16kWh, air heat pump with a heating power of at least 40kW
Location 4 - Primary School No. 2, ul. Węglowa 54; 43-502 Czechowice-Dziedzice
- Photovoltaic installation of the new school with a minimum power of 11.5kWp, energy storage with a usable capacity of at least 12kWh, air heat pumps with a total heating power of at least 120kW
Location 5 - Primary School No. 5, ul. Klasztorna 21; 43-502 Czechowice-Dziedzice
- Photovoltaic installation with a minimum power of 49kWp, energy storage with a usable capacity of at least 16kWh, air heat pumps with a total heating power of at least 240kW
Location 6 - Primary School No. 7, ul. Szkolna 6; 43-502 Czechowice-Dziedzice
- Photovoltaic installation with a minimum power of 45kWp, energy storage with a usable capacity of at least 16kWh, air heat pumps with a total heating power of at least 200kW
Location 7 - Primary School No. 2, ul. Miliardowicka 46; 43-518 Ligota
- Photovoltaic installation with a minimum power of 49kWp,
• for connection point PPE1: min. 24kWp
• for connection point PPE2: min. 25kWp
and energy storage with a total usable capacity of at least 24kWh
• for connection point PPE1: min. 12kWh
• for connection point PPE2: min. 12kWh,
air heat pumps with a total heating power of at least 80kW
NOTE!
The roof of the building SP No. 2 in Ligota at ul. Miliardowicka is under renovation (except for the gym with locker room facilities and the new segment). A detailed description is included in Appendix No. 10 – Functional and Utility Program (PFU), i.e. description of the roof renovation works of building SP No. 2 in Ligota – scope of planned construction works, drawing A_02 roof plan and K01 truss plan.
Location 8 - Eco and Green Center in Czechowice-Dziedzice, ul. hrabiego Kotulińskiego 2; 43-502 Czechowice-Dziedzice
- Photovoltaic installation with a minimum power of 24.5kWp including:
• existing installation 5.5kW;
• new installation with a minimum power of 19kW, and energy storage with a usable capacity of at least 12kWh

The scope of the order includes:
a) preparation of complete design documentation separately for each location along with obtaining all approvals, permits, and notifications if required by applicable law,
b) execution in accordance with the requirements and additional information described in detail by the Contracting Authority in the Functional Utility Program, construction and assembly works and supplies along with the commissioning of photovoltaic installations and heat pumps in accordance with the law regulations,
c) obtaining on behalf and for the benefit of the Contracting Authority all necessary permits and administrative decisions allowing for the use of the installation,
d) providing quality warranty for the completed installations and ensuring service and technical inspections during the warranty period.

A detailed description of the subject of the order is indicated in the Functional Utility Program (hereinafter PFU) which is an attachment No. 10 to the SWZ. Within this order, the scope of investment described in the Functional Utility Program (PFU) will be realized.
The order is co-financed from the European Union funds from the Just Transition Fund under the European Funds for Silesia Program 2021-2027, Priority FESL.10 European Funds for Transition, Action FESL.10.06 Development of distributed energy based on renewable sources.

The Buyer:
GMINA CZECHOWICE-DZIEDZICE
Additional information:
Link:
View Full Notice
Link:
Download Full Notice as PDF
Link:
Additional document: generated_id
CPV Code(s):
09331200 - Solar photovoltaic modules
09332000 - Solar installation
31430000 - Electric accumulators
42511110 - Heat pumps
45000000 - Construction work
45261215 - Solar panel roof-covering work
71000000 - Architectural, construction, engineering and inspection services