Installation of the PV system with battery storage on the flat roof with extensive greenery of the new fire station building in Gedern
LOT-0000
Gedern-FWGH-PV System.
The following services are to be provided:
KG 442 PV system
52 pieces of PV modules
500 m PV module cable
16 pieces of MC connector pairs
1 piece hybrid inverter
1 piece battery
1 piece generator connection box with fire protection circuit
288 m high current cables
100 m cable tray with lid
2 pieces of bends for cable tray with lid
5 pieces of T-junction for cable tray with lid
251 m data cables
1 piece smart meter
1 piece data manager