To replace an existing system, a new, separate HPC system in the form of an x86-based HPC Linux cluster including storage systems and GPU resources is to be procured in this EU-wide open procurement procedure based on the performance description provided here.
LOT-0001
EU-wide Open Procedure for the Establishment and Operation of an HPC Computing Facility at Christian-Albrechts-University Kiel.
This new system must be usable as an independent unit interactively and via the batch system Slurm alongside the existing HPC systems. The system must be integrated into the climate control concept of the CAU data center and must be delivered as a complete system, operational with all necessary components.