Creation and delivery of the charging infrastructure for loading electric buses:
• All necessary components and services (transport, structural measures, construction, cabling, and installation) from the transformer station to the vehicle's contact system.
o This includes civil engineering and the preparation of foundations. The contractor must also coordinate with the supplier of the transformer station. Efforts must be priced accordingly.
• Charging management system for monitoring and controlling charging processes
• Medium voltage, low voltage, and direct current cables
• 8 switchable depot boxes and CCS charging cables with pull-rope for a total of eight charging points (accessible for disabled persons),
• Alternatively, two satellite versions "charging columns" with crash protection
• Training of the client’s personnel for safe handling and operation of the
• Charging infrastructure power unit with 600 kVA
• Multi-year maintenance of the charging infrastructure.
LOT-0001
LOT-0001 E95511449
Delivery and installation of a charging infrastructure for charging battery buses.
From the transformer building, the low voltage cable must be laid in a conduit to the 600 kW power unit/compact station. The compact station must be mounted on a suitable foundation and secured with appropriate crash protection. The conduit to the power unit must be designed so that an additional 600 kW power unit can be connected directly later.
The power unit to be supplied must be designed in such a way that without further technical upgrades, an additional 4 satellites or depot boxes can be connected at a later date. The power unit must have a dynamic load distribution so that up to 150 kW is available at each charging point. The control of the load distribution must be managed via a charging management system.