Photovoltaic Power Plant - Municipality of Zalău (procurement of products, including installation and commissioning, connection works to the electricity grid and technical-economic documentation phase P.T. and DTAC, DTOE, obtaining A.C.) | Tenderlake

Photovoltaic Power Plant - Municipality of Zalău (procurement of products, including installation and commissioning, connection works to the electricity grid and technical-economic documentation phase P.T. and DTAC, DTOE, obtaining A.C.)

Contract Value:
RON 6M - 6M
Notice Type:
Contract Notice
Published Date:
09 December 2025
Closing Date:
18 December 2025
Location(s):
RO116 Sălaj (RO Romania/ROMÂNIA)
Description:
The project involves the supply, installation, and commissioning of photovoltaic panels and inverters, along with connection works to the electricity grid and necessary technical documentation for the Municipality of Zalău.

The overall objective of the supply contract is to supply, install, and commission 2000 pieces of photovoltaic panels mounted on an aluminum structure (SpeedRail type, anchored in the ground), with an inclination of 20 degrees, with a unit power of 500W, monocrystalline; 10 pieces of 100kW inverters mounted in a technical room and the realization of the connection installation to the electricity grid and the preparation of technical-economic documentation phase P.T. and DTAC, DTOE and obtaining A.C. Design services, respectively the preparation of technical-economic documentation phase PT and DTAC, DTOE, obtaining A.C. for "Photovoltaic Power Plant - Municipality of Zalău". The preparation of DTAC + DTOE + PT will be carried out in accordance with the provisions of HG no. 907/2016, with subsequent amendments and completions, DTAC (Technical documentation for obtaining the Building Permit) and obtaining AC, PT (Technical Project) and execution details (technical memos, calculation briefs, specifications, lists of quantities of works, drawn pieces and DTOE - technical documentation for the organization of execution), preparing documentation for obtaining agreements/approvals at the PT phase and obtaining them; updated general estimate, confidential estimate. The execution of the works for the realization of the connection installation to the electricity supply network of the installed equipment and delivery of the produced energy to the grid will be done according to the technical connection notice no. 6060250100029 / 30.05.2025. The works must be completed in such a way as to respect the delivery and commissioning deadline of the products, of 12 months from the signing of the contract by the parties. They will be accepted in accordance with the provisions of the Regulation approved by HG 273/ 1994. A brief description of the connection solution correlated with the evolution of the approved power, established by the solution study no. 6060250100029- no. ORIZONT ELECTRIC no. 43A/2025 - Variant I approved CTA DEER with document no. 10/328/237/ 10.06.2025: a) The connection point is established at a voltage level of 20 kV, at the existing LES 20 kV between PTZ Epurare and LEA 20 kV Sărmășag, separator 8226, PTZ 8101 EPURARE, – kV, - kVA b) The existing connection installation at the time of issuing the notice: NOT THE CASE c) Works for the realization of the connection installation: it will identify / section / sleeve the existing LES 20 kV between PTZ Epurare and LEA 20 kV Sărmășag, separator 8226 and will create an MT circuit, input - output, made with MT LES to a Connection Point (PC), which will be placed at the entrance to the photovoltaic park; The deadline by which any economic operator interested in participating in the public procurement procedure has the right to request clarifications or additional information regarding the award documentation is 20 days before the deadline for submitting offers. In accordance with the provisions of art. 160 para. (2) of Law 98/2016 with subsequent amendments and completions, the Contracting Authority sets the deadline within which it will respond to all requests for clarification/additional information on the 11th day before the deadline for submitting offers. The response deadline to clarifications has been set so that economic operators have an adequate period to analyze the award documentation and subsequently to prepare the offers in light of the answers provided by the contracting authority.


LOT-0000
Default lot.
The subject of the procurement is the acquisition of the supply contract for the objective "Photovoltaic Power Plant - Municipality of Zalău (procurement of products, including installation and commissioning, connection works to the electricity grid and technical-economic documentation phase P.T. and DTAC, DTOE, obtaining A.C.)", in accordance with the requirements of the specifications no. 60360/07.08.2025. The overall objective of the supply contract is to supply, install, and commission 2000 pieces of photovoltaic panels mounted on an aluminum structure (SpeedRail type, anchored in the ground), with an inclination of 20 degrees, with a unit power of 500W, monocrystalline; 10 pieces of 100kW inverters mounted in a technical room and the realization of the connection installation to the electricity grid and the preparation of technical-economic documentation phase P.T. and DTAC, DTOE and obtaining A.C. Design services, respectively the preparation of technical-economic documentation phase PT and DTAC, DTOE, obtaining A.C. for "Photovoltaic Power Plant - Municipality of Zalău". The preparation of DTAC + DTOE + PT will be carried out in accordance with the provisions of HG no. 907/2016, with subsequent amendments and completions, DTAC (Technical documentation for obtaining the Building Permit) and obtaining AC, PT (Technical Project) and execution details (technical memos, calculation briefs, specifications, lists of quantities of works, drawn pieces and DTOE - technical documentation for the organization of execution), preparing documentation for obtaining agreements/approvals at the PT phase and obtaining them; updated general estimate, confidential estimate. The execution of the works for the realization of the connection installation to the electricity supply network of the installed equipment and delivery of the produced energy to the grid will be done according to the technical connection notice no. 6060250100029 / 30.05.2025. The works must be completed in such a way as to respect the delivery and commissioning deadline of the products, of 12 months from the signing of the contract by the parties. They will be accepted in accordance with the provisions of the Regulation approved by HG 273/ 1994. A brief description of the connection solution correlated with the evolution of the approved power, established by the solution study no. 6060250100029- no. ORIZONT ELECTRIC no. 43A/2025 - Variant I approved CTA DEER with document no. 10/328/237/ 10.06.2025: a) The connection point is established at a voltage level of 20 kV, at the existing LES 20 kV between PTZ Epurare and LEA 20 kV Sărmășag, separator 8226, PTZ 8101 EPURARE, – kV, - kVA b) The existing connection installation at the time of issuing the notice: NOT THE CASE c) Works for the realization of the connection installation: it will identify / section / sleeve the existing LES 20 kV between PTZ Epurare and LEA 20 kV Sărmășag, separator 8226 and will create an MT circuit, input - output, made with MT LES to a Connection Point (PC), which will be placed at the entrance to the photovoltaic park; Estimated total value without VAT: 5.603.403,63 Currency: RON, of which: • Design services phase PT AND DTAC, DTOE and Obtaining Building Permit 65.000,00 lei without VAT: - Technical project and execution details 60.000,00 - Technical assistance from the designer 5.000,00 • Supply of products and works 5.538.403,63 lei without VAT, of which: - Expenses for obtaining and arranging the land 250.000,00 lei without VAT - Expenses for ensuring utilities 1.011.403,63 lei without VAT - Expenses for basic investment (equipment, installation) 4.257.000,00 lei without VAT: - Technological and functional equipment that requires assembly 3.663.000,00 lei without VAT - Assembly of technological and functional equipment 594.000,00 lei without VAT - Construction works and installations related to the organization of the site 20.000,00 lei without VAT

The Buyer:
PRIMARIA MUNICIPIULUI ZALAU
Additional information:
Link:
Download Full Notice as PDF
Link:
View Full Notice
Link:
Additional document: Documentatia de achizitie
CPV Code(s):
09331000 - Solar panels
45310000 - Electrical installation work
71323100 - Electrical power systems design services
79930000 - Specialty design services