Concession for the Design, Installation, Operation and Maintenance of Electric Vehicle Charging Points and Associated Infrastructure | Tenderlake

Concession for the Design, Installation, Operation and Maintenance of Electric Vehicle Charging Points and Associated Infrastructure

Contract Value:
GBP 90M -
Notice Type:
Contract Notice
Published Date:
17 July 2026
Closing Date:
17 September 2026
Location(s):
UKJ SOUTH EAST (ENGLAND) (UK UNITED KINGDOM)
UKK SOUTH WEST (ENGLAND) (UK UNITED KINGDOM)
Description:
The project involves designing, installing, operating, and maintaining electric vehicle charging points and related infrastructure for VIVID's residential and operational properties.
To provide the design, installation, operation and maintenance of electric vehicle charging points and associated infrastructure, for the delivery of electric vehicle charging facilities across VIVID's residential and operational estate.

Download full details as .pdf
The Buyer:
VIVID Housing Ltd
Additional information:
Link:
View Notice Source
Link:
Download Full Notice as PDF
CPV Code(s):
64226000 - Telematics services
65300000 - Electricity distribution and related services