GMH-Photovoltaic System including Battery Storage System | Tenderlake

GMH-Photovoltaic System including Battery Storage System

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
28 April 2026
Closing Date:
15 May 2026
Location(s):
DEA2B Rheinisch-Bergischer Kreis (DE Germany/DEUTSCHLAND)
Assessment:
This notice contains 1 positive AI Assessment(s) of your products/services' relevance for this procurements.  
Sign in to Tenderlake with your Pro or Primary account to read the assessments.
Description:
The RVK is developing a depot for hydrogen fuel cell and battery-electric buses in Bensberg, which includes the installation of a grid-connected photovoltaic system with a battery storage system and necessary infrastructure.

The RVK is a transport company whose core transport area extends over the district of Euskirchen, the Rheinisch-Bergischer district, and the left bank of the Rhein-Sieg district. The services are provided both on its own lines and on behalf of other transport companies. The RVK plans to establish a depot for hydrogen fuel cell and battery-electric buses as part of the construction project. The construction site of approximately 13,500 m² is located in Bensberg, a district of the city of Bergisch-Gladbach. The area is located east of the L195 Friedrich-Ebert-Straße and west of Steinhaus street.
On the premises, there will be a support structure with a hydrogen production plant, an office and administrative building with parking deck and inspection hall, 3 bus ports, a bus portal washing system, and the associated transport areas. The buildings of the depot cover an area of about 5,300 m², have a gross floor area of approximately 11,500 m², and a gross volume of about 39,950 m³.
The services proposed in the procurement package for the photovoltaic system mainly include the following services: Creation of a grid-connected photovoltaic system including a battery storage system and zero feed-in regulation according to VDE-AR-N 4110.


LOT-0001
LOT-0001 E53183542
Creation of a grid-connected photovoltaic system including a battery storage system and zero feed-in regulation according to VDE-AR-N 4110.
The RVK is a transport company whose core transport area extends over the district of Euskirchen, the Rheinisch-Bergischer district, and the left bank of the Rhein-Sieg district. The services are provided both on its own lines and on behalf of other transport companies. The RVK plans to establish a depot for hydrogen fuel cell and battery-electric buses as part of the construction project. The construction site of approximately 13,500 m² is located in Bensberg, a district of the city of Bergisch-Gladbach. The area is located east of the L195 Friedrich-Ebert-Straße and west of Steinhaus street.
On the premises, there will be a support structure with a hydrogen production plant, an office and administrative building with parking deck and inspection hall, 3 bus ports, a bus portal washing system, and the associated transport areas. The buildings of the depot cover an area of about 5,300 m², have a gross floor area of approximately 11,500 m², and a gross volume of about 39,950 m³.
The services proposed in the procurement package for the photovoltaic system mainly include the following services: Creation of a grid-connected photovoltaic system including a battery storage system and zero feed-in regulation according to VDE-AR-N 4110 consisting of
- PV generators
- Inverters
- Energy storage + inverter
- Energy management
- Feed-in distributor according to VDE-AR-N 4110
- Pipeline systems
- Conduit support systems
- Supply systems
- Rails for module fastening
- Fire protection measures

The Buyer:
RVK | Regionalverkehr Köln GmbH
Additional information:
Link:
View Full Notice
Link:
Additional document: E53183542
Link:
Download Full Notice as PDF
CPV Code(s):
09332000 - Solar installation
31430000 - Electric accumulators
45261215 - Solar panel roof-covering work
45310000 - Electrical installation work
45311000 - Electrical wiring and fitting work
51110000 - Installation services of electrical equipment