Construction of Battery Systems in the HSE Group | Tenderlake

Construction of Battery Systems in the HSE Group

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
13 April 2026
Closing Date:
17 April 2026
Location(s):
SIZZZ Extra-Regio NUTS 3 (SI Slovenia/SLOVENIJA)
Description:
The project involves the design, supply, installation, commissioning, and maintenance of battery storage systems for the HSE group, requiring necessary project documentation and permitting, with actual orders dependent on the contracting authority's needs.

The subject of this public procurement is the design, supply, installation, commissioning, and maintenance of battery storage systems in the HSE group. The order includes the preparation and submission of all necessary project documentation (PZI, PID, DZO) and involves all activities required for the successful acquisition of a usage permit. Battery storage systems will be installed outdoors at various locations alongside existing electroenergetic facilities of the HSE group.

The specified projects represent tentative projects, and the contracting authority is not obliged to award all projects. Actual project orders will depend on the actual needs of the contracting authority.

A more detailed specification of the order (minimum technical requirements) is available from the list of technical data - the technical part of the documentation related to the public procurement (hereinafter: technical part/closed part), which interested bidders can obtain according to the rules of the documentation related to public procurement.

The collection of the closed part of the documentation related to public procurement is a condition for submitting an offer.

The contracting authority wishes to:
- obtain offers based on which it will conclude a framework agreement for a period of forty (40) months or until the maximum estimated contract value is utilized under the framework agreement, with the right to extend the validity period of the framework agreement if the maximum estimated value is not utilized/achieved in forty (40) months, with a maximum of three (3) bidders whose offers will be permissible and according to the criterion of the most favorable;
- select a supplier for the delivery of goods of the first individual order from the most favorable final permissible offer from the procedure with negotiations with announcement, from among the bidders with whom a framework agreement has been concluded.

The rules related to the manner of submission of public procurement are described in detail in the section on the Method of Submission of Public Procurement documentation related to public procurement.


LOT-0000
Construction of Battery Systems in the HSE Group.
The subject of this public procurement is the design, supply, installation, commissioning, and maintenance of battery storage systems in the HSE group. The order includes the preparation and submission of all necessary project documentation (PZI, PID, DZO) and involves all activities required for the successful acquisition of a usage permit. Battery storage systems will be installed outdoors at various locations alongside existing electroenergetic facilities of the HSE group.

The specified projects represent tentative projects, and the contracting authority is not obliged to award all projects. Actual project orders will depend on the actual needs of the contracting authority.

A more detailed specification of the order (minimum technical requirements) is available from the list of technical data - the technical part of the documentation related to the public procurement (hereinafter: technical part/closed part), which interested bidders can obtain according to the rules of the documentation related to public procurement.

The collection of the closed part of the documentation related to public procurement is a condition for submitting an offer.

The contracting authority wishes to:
- obtain offers based on which it will conclude a framework agreement for a period of forty (40) months or until the maximum estimated contract value is utilized under the framework agreement, with the right to extend the validity period of the framework agreement if the maximum estimated value is not utilized/achieved in forty (40) months, with a maximum of three (3) bidders whose offers will be permissible and according to the criterion of the most favorable;
- select a supplier for the delivery of goods of the first individual order from the most favorable final permissible offer from the procedure with negotiations with announcement, from among the bidders with whom a framework agreement has been concluded.

The rules related to the manner of submission of public procurement are described in detail in the section on the Method of Submission of Public Procurement documentation related to public procurement.

The Buyer:
HOLDING SLOVENSKE ELEKTRARNE d.o.o.
Additional information:
Link:
Download Full Notice as PDF
Link:
View Full Notice
Link:
Additional document: DocLot0
CPV Code(s):
31440000 - Batteries