Copy of Construction of the Central Control Room of the Water Supply and Sewerage Plant (ZWiK)
Contract Value:
-
Notice Type:
Contract Notice
Published Date:
29 September 2026
Closing Date:
05 October 2026
Location(s):
PL81 Lubelskie (PL Poland/POLSKA)
Description:
The project involves designing and building a Central Control Room for the Water Supply and Sewerage Plant in Chełm, including comprehensive design documentation, construction of the facility, modernization of existing structures, and installation of various systems.
Modernization of the water supply system of the City of Chełm 1. The subject of the contract is the implementation in the "design and build" formula of the task entitled "Construction of the Central Control Room of the Water Supply and Sewerage Plant (ZWiK)" at Bieławin 5 Street in Chełm. The scope of the contract includes the preparation of complete multi-branch design documentation, obtaining the required decisions, arrangements, permits, and notifications, and then the construction of a single-storey building of the central control room connected with the existing social and office building. The task also includes construction works in the existing building, including its thermal modernization, demolition works, execution of sanitary, electrical, telecommunication, and security systems installations, equipment covered by the Functional and Utility Program (PFU), and land development. The contract also includes conducting tests, research and commissioning, obtaining documents required for the use of the facility, exercising author supervision, and handing over the complete as-built documentation. The detailed scope of the contract is defined in the Functional and Utility Program along with Erratum No. 1 (referred to as PFU) and other contract documents. 2. Address of the main investment object: Bieławin 5 Street 22-100 Chełm Province: Lublin Country: Poland Area: 0007 Plots No. 214/15, 214/9 3. Warranty period requirements: The quality warranty period is 60 months and begins on the day of completion of the Contract Subject. 4. A detailed description of the subject matter of the contract is provided in the PFU along with Erratum No. 1 marked as Annex No. 9 to the Contract Announcement and the description of requirements for the Contractor constituting the Draft Contract included in Annex No. 10 to the Contract Announcement. 5. The Contracting Authority does not allow the submission of alternative offers. Category: Construction works / Construction works CPV: 45000000-7 Construction work, 45112710-5 Works related to landscaping, 45200000-9 Construction work for complete buildings or parts thereof and civil engineering works, 45262700-8 Building renovation, 45300000-0 Installation work in buildings, 45400000-1 Finishing work in buildings, 71220000-6 Architectural design services, 71240000-2 Architectural, engineering and planning services, 71247000-1 Supervision of construction work, 71248000-8 Project and documentation supervision Place of performance: Chełm, Lublin Province Warranty period: 60 months Criteria for evaluating offers: - The most advantageous offer will be the one not subject to rejection, submitted by a Contractor not excluded and meeting the participation conditions, which obtains the highest score in the price criterion.
Participation conditions: - Knowledge and experience: Regarding the condition concerning technical or professional capacity, the Contracting Authority will consider the condition met if: a) in the last 3 years prior to the deadline for submission of tenders, or if the business operation period is shorter – within that period, the Contractor has properly performed at least one service consisting in the preparation of a multi-branch construction design for the construction and/or reconstruction and/or extension of a building where a social and sanitary facility intended for at least 40 persons per one shift was designed, including at least changing rooms, toilets, showers, and a room for eating meals, based on which a final building permit decision or an equivalent approval from the competent authority of the country where the investment was implemented was issued; b) in the last 5 years prior to the deadline for submission of tenders, or if the business operation period is shorter – within that period, the Contractor has properly completed at least one construction work consisting in erecting a new building with a masonry, reinforced concrete, or mixed masonry and reinforced concrete structure, with a gross cubic capacity of not less than 1,500 m³. Additional explanations: 1) A building with a masonry, reinforced concrete, or masonry-reinforced concrete structure should be understood as a building whose main load-bearing system was made using one of the listed technologies. 2) Construction of a new building means the creation of a building in a specified location which did not exist before the work started, excluding superstructure, reconstruction, or renovation of an existing building. For extensions, the cubic capacity condition applies to the newly built part. 3) For the purpose of assessing compliance with the cubic capacity condition, the gross cubic capacity of the building should be understood as per § 3 point 24 of the Regulation of the Minister of Infrastructure of April 12, 2002, on technical conditions buildings and their location should meet. 4) It is allowed for one of the persons designated to perform the role of Site Manager also to perform the role of Construction Manager, if the building licenses held correspond to the type and scope of works covered by the building permit and design documentation. 5) Professional experience "in the field of preparing construction designs" means actual participation in the design process as a designer in their specialty. 6) The experience condition must be met by the person designated for the respective role during the contract execution. For designers, experience gained only as a verifier of a design is not taken into account. 7) Time periods expressed in years, regarding proving participation conditions, are counted backward from the day of the tender submission deadline. 8) Persons assigned by the Contractor to perform the contract who will hold independent technical functions in construction must have the required construction licenses for design or construction management, pursuant to the Act of July 7, 1994 - Construction Law and the Regulation of the Minister of Investment and Development of April 29, 2019, on professional preparation for performing independent technical functions in construction. The Contracting Authority also accepts equivalent licenses issued under previously applicable regulations, provided their scope is equivalent to that required by the Contracting Authority. 9) For Contractors indicating persons holding professional qualifications acquired in EU Member States, EEA countries, or the Swiss Confederation, the Contracting Authority allows their participation, provided those qualifications are recognized according to Article 12a of the Construction Law and the Act of December 22, 2015, on rules of recognition of professional qualifications acquired in EU Member States, implementing Directive 2005/36/EC of the European Parliament and Council. 10) Persons performing independent technical functions in construction must meet conditions regarding membership in the relevant professional self-government chamber, according to the Act of December 15, 2000 on professional self-governments of architects and construction engineers. 11) The Contractor is obliged to ensure that the persons designated for the contract have the required licenses and qualifications throughout the contract duration. - Persons capable of performing the contract: The Contracting Authority requires Contractors submitting an offer to prove that they have or will have during contract execution at least the following persons: a) one person acting as the team leader - architect, holding unlimited design licenses in the architectural specialty with at least 3 years of professional experience in the field of preparing construction designs (counted from registration on the relevant professional list of the Regional Chamber of Architects or equivalent in qualifications acquired in other countries and/or under earlier regulations), who as an architectural designer participated in preparing the construction design of a building where social and sanitary facilities intended for at least 20 persons per shift were designed, including at least changing rooms, toilets, showers, and a room for eating meals, based on which a final building permit decision or equivalent approval of the competent authority of the country where the investment was carried out was issued; b) one person acting as the Structural Design Engineer, holding unlimited design licenses in the structural construction specialty, documenting at least 3 years of professional experience in preparing construction designs (counted from registration on the relevant professional list of the Regional Chamber of Construction Engineers or equivalent); c) one person acting as the Electrical Installation Designer, holding unlimited design licenses in the specialty of installations in the field of electrical and power networks, installations and devices, documenting at least 3 years of professional experience in preparing construction designs (counted from registration on the relevant professional list or equivalent); d) one person acting as the Sanitary Installation Designer, holding unlimited design licenses in the specialty of installations in heating, ventilation, gas, water supply and sewerage networks, installations and devices, documenting at least 3 years of professional experience in preparing construction designs; e) one person acting as the Road Design Engineer, holding at least limited design licenses in the road specialty, documenting at least 3 years of professional experience in preparing construction designs; f) one person acting as the Telecommunications Installation Designer, holding at least limited design licenses in the specialty of telecommunication networks, installations and devices, documenting at least 3 years of professional experience in preparing construction designs; Combination of the above functions for Designers and the team leader is allowed if the person combining these roles meets all conditions required for each function. g) one person acting as Construction Works Manager (structural and construction): - holding unlimited construction licenses in structural and construction specialty to manage construction works, - having at least 5 years of experience (not assistant) as construction manager, works manager, or supervision inspector in structural and construction works. h) one person acting as Sanitary Works Manager: - holding unlimited construction licenses in installation specialty for heating, ventilation, gas, water supply and sewerage to manage construction works, - having at least 5 years of experience (not assistant) as construction manager, works manager, or supervision inspector in sanitary works. i) one person acting as Electrical Works Manager: - holding unlimited construction licenses in installation specialty for electrical and power networks to manage construction works, - having at least 5 years of experience (not assistant) as construction manager, works manager, or supervision inspector in electrical works. Combination of the above managerial functions is allowed if the person combining them fulfills all conditions required for each respective function.
The Buyer:
Miejskie Przedsiębiorstwo Gospodarki Komunalnej Sp. z o.o.