Framework Agreement Battery Energy Storage Systems - Energielandschap Lageland | Tenderlake

Framework Agreement Battery Energy Storage Systems - Energielandschap Lageland

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
28 September 2026
Closing Date:
06 October 2026
Location(s):
NL NEDERLAND (NL Netherlands/NEDERLAND)
Assessment:
This notice contains 1 positive AI Assessment(s) of your products/services' relevance for this procurements.  
Sign in to Tenderlake with your Pro or Primary account to read the assessments.
Description:
The Client seeks to establish a framework agreement with three contractors for the development of a Battery Energy Storage System at Energielandschap Lageland, including a phased approach for initial and future expansions.

The Client intends to enter into a framework agreement (the Agreement) with three contractors for the realisation of the Battery Energy Storage System (BESS) at Energielandschap Lageland.

The specific contracts under the Agreement will be put out to tender as turnkey EPC contracts for the Energielandschap Lageland battery park. The Client is procuring a functional end product: a ready-to-use, grid-compliant and safe battery system that meets the performance requirements set out in the tender specifications. The EPC contractor is responsible for the design, supply, construction, system integration, testing, commissioning and handover of a ready-to-use battery system, as well as (via a separate O&M agreement) for its long-term operation and maintenance. - Phase 1: approximately 15 MW // 60 MWh BESS, connected to a 21 MW grid connection, with commissioning planned for Q1 2029.
- Phase 2: expansion to at least 50 MW // 200 MWh BESS, in conjunction with the upscaling of the connection (feed-in up to 260 MW, off-take up to 145 MW). Phase 2 is not being awarded at this stage, but is secured within the framework agreement and will be called off later via a mini-competition between the framework contractors. The indicative timetable is around 2032/2033, subject to TenneT’s approval.


LOT-0000
1
Framework Agreement BESS.
The Client intends to enter into a Framework Agreement (the Agreement) with three (3) parties for the construction of the BESS. - Phase 1: approximately 15 MW // 60 MWh BESS, connected to a 21 MW grid connection, with commissioning planned for Q1 2029.
- Phase 2: expansion to at least 50 MW // 200 MWh BESS, in conjunction with the upscaling of the connection (feed-in up to 260 MW, off-take up to 145 MW). Phase 2 is not being awarded at this stage, but is secured within the framework agreement and will be called off later via a mini-competition between the framework contractors. The indicative timetable is around 2032/2033, subject to TenneT’s approval.

The Buyer:
Batterij Meerstad Noord B.V.
Additional information:
Link:
Additional document: documentsId
Link:
Download Full Notice as PDF
Link:
View Full Notice
CPV Code(s):
31440000 - Batteries
45300000 - Building installation work
45310000 - Electrical installation work