Electrical installation of the storage site with PV system, battery storage, and E-charging station
LOT-0000
Electrical installation.
Construction project: Südfriedhof Frankfurt, new construction storage site BA1
Trade: Electrical Engineering
In the building, electrical installations are planned:
1 pc. Transformer measuring cabinet
1 pc. Electrical sub-distribution as a wall cabinet
Approx. 15 pcs. Installation devices (switches, sockets, junction boxes, etc.)
Approx. 1,300 m High current cabling
Approx. 150 m Low current cabling / data cabling
Approx. 60 m Laying systems / cable trays and cable ladders
Approx. 100 m Laying systems / electrical installation pipes
Approx. 20 pcs. Lighting fixtures
Approx. 100 m Lightning protection capture line
Approx. 10 pcs. Lightning protection capture rods
1 pc PV system with approx. 9 kWp
1 pc. Battery storage with approx. 16 kWh
2 pcs. E-charging stations with 2 x 11 kW
Commissioning of all systems, documentation of the system technology, training of the operating personnel.