Purchase along with the delivery and commissioning of an energy storage system with a power of at least 1 MW and a battery capacity of at least 4.15 MWh | Tenderlake

Purchase along with the delivery and commissioning of an energy storage system with a power of at least 1 MW and a battery capacity of at least 4.15 MWh

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
26 September 2025
Closing Date:
27 October 2025
Location(s):
PL721 Kielecki (PL Poland/POLSKA)
Description:
The order involves the delivery, assembly, commissioning, and operational transfer of a complete battery energy storage system with specified minimum power and capacity, including required testing and personnel training, as part of the Civil Protection and Defense Program.

The subject of the order includes, in particular: delivery, assembly, commissioning, and transfer to operation of a complete battery energy storage system (BESS) with minimum parameters: installed power ≥ 1.1 MW, installed capacity ≥ 4.15 MWh, along with the execution of required factory and acceptance tests, delivery to the site of operation, and training of the Ordering Party's personnel. The subject of the order must meet all technical requirements specified in this SWZ and in the Description of the Subject of the Order. Implementation of the subject of the order within the Framework of the Civil Protection and Defense Program for the years 2025-2026. The detailed scope of delivery and method of order execution are specified in the following documents which are attachments to the SWZ: • Description of the Subject of the Order – Attachment No. 1 to the SWZ (detailed technical, quality, normative, and functional requirements regarding BESS), • FAT Procedure – Attachment No. 1A to the SWZ, • SAT Procedure – Attachment No. 1B to the SWZ, • FAT Protocol – Attachment No. 1C to the SWZ. • SAT Protocol – Attachment No. 1D to the SWZ. • Template contract – Attachment No. 10 to the SWZ, containing the complete provisions regarding the implementation of the order.


LOT-0001
TZ.262.14.2025
Purchase along with the delivery and commissioning of an energy storage system with a power of at least 1 MW and a battery capacity of at least 4.15 MWh.
The subject of the order includes, in particular: delivery, assembly, commissioning, and transfer to operation of a complete battery energy storage system (BESS) with minimum parameters: installed power ≥ 1.1 MW, installed capacity ≥ 4.15 MWh, along with the execution of required factory and acceptance tests, delivery to the site of operation, and training of the Ordering Party's personnel. The subject of the order must meet all technical requirements specified in this SWZ and in the Description of the Subject of the Order. Implementation of the subject of the order within the Framework of the Civil Protection and Defense Program for the years 2025-2026. The detailed scope of delivery and method of order execution are specified in the following documents which are attachments to the SWZ: • Description of the Subject of the Order – Attachment No. 1 to the SWZ (detailed technical, quality, normative, and functional requirements regarding BESS), • FAT Procedure – Attachment No. 1A to the SWZ, • SAT Procedure – Attachment No. 1B to the SWZ, • FAT Protocol – Attachment No. 1C to the SWZ. • SAT Protocol – Attachment No. 1D to the SWZ. • Template contract – Attachment No. 10 to the SWZ, containing the complete provisions regarding the implementation of the order.

The Buyer:
Gmina Kielce
Additional information:
Link:
Download Full Notice as PDF
Link:
Additional document: generated_id
Link:
View Full Notice
CPV Code(s):
31154000 - Uninterruptible power supplies
31200000 - Electricity distribution and control apparatus
31440000 - Batteries